1
by Crowther, Justin.
Published [2013]
“...-Watana Hydroelectric Project, eulachon studies, 2013 proposed studies...”Published [2013]
Report Number(s): SuWa 202
Link to full text
2
Published 2014]
“...Technical memorandum, 2015 proposed eulachon spawning habitat study modifications...”Report Number(s): SuWa 234
List of all technical memorandums that were submitted as attachments to the cover letter filed to FERC on September 17, 2014 (SuWa 228).Direct link to this document.
3
Published [2013]
“...Final study plan. Eulachon run timing, distribution, and spawning in the Susitna River 9.16...”Report Number(s): SuWa 200
Direct link to this section.List of related Final Study Plans.