41
Published [1983]
Contents: ';
“...: Exhibit B ; Exhibit D ; Additional supplemental reports required ; Financial plan. (APA 1169)....”Report Number(s): APA 1167 APA 1168 APA 1169
Direct link to the first volume.List of all volumes.
42
43
Published [1983]
Contents: ';
“... -- Preliminary mechanical costs for comparison of alternatives -- Unit parameters -- Revisior to unit parameters...”Report Number(s): APA 485
Link to full text
44
45
46
47
Published [1984]
“...Susitna Hydroelectric Project. Explanation of August 1984 revised cost estimate...”Report Number(s): APA 1919 APA 1920
Direct link to the first volume.List of all volumes.
48
Published [1983]
Contents: ';
“...Engineering and economic aspects....”Report Number(s): APA 504 APA 505 APA 506 APA 1619 APA 1620
Direct link to Volume 1 (Engineering and economic aspects).List of all volumes of this supplement.
Link to the feasability report (final draft) and list of all documents related to it.
49
Published [1981]
Contents: ';
“... -- Environmental implications -- Economic feasibility -- Project financing -- Permit requirements and construction...”Report Number(s): APA 2930 SUS 64
Link to full text
50
Published [2014]
Contents: ';
“... and milestones -- 2014 field studies -- Project economics -- Expenditures....”Report Number(s): SuWa 275
Link to full text
51
Published [2016]
Contents: ';
“...Letter from the Executive Director -- Quantifying economic impact -- Engineering and safety...”Report Number(s): SuWa 297
Link to full text
52
Published [2012]
Contents: ';
“... in renewable energy -- Project economics -- History of Susitna-Watana Hydro -- Public outreach -- Stakeholder...”Report Number(s): SuWa 179
Link to full text
53
54
55
Published [1981]
Contents: ';
“...Economic analysis /...”Report Number(s): APA 3269 SUS 46
Link to full textList of issues in the related serial.
List of issues in the related serial to which this is a companion.
56
Published [2018]
Contents: ';
“... Project status summary -- Project history -- Engineering & safety milestones -- Economic milestones...”Report Number(s): SuWa 307
Link to full text
57
Published [2017]
Contents: ';
“... Hydroelectric Project status summary -- Project history -- Engineering & safety milestones -- Economic...”Report Number(s): SuWa 298
Link to full textLink to full text
58
Published [1981]
Contents: ';
“... model -- F. Single and multi-reservoir hydropower simulation studies -- G. Systemwide economic...”Report Number(s): APA 1284
Link to full text