Environmental studies procedures manual. Subtask 7.14, Access road analysis /

This procedure manual describes the research methodology for conducting a study for the proposed Susitna Hydroelectric Project. The purposes of the study are to select an environmentally sound access road to the dam sites planned for the Susitna Hydroelectric Project and to provide an impact assessm...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Environmental studies procedures manual. Subtask 7.14, Access road analysis

Subtask 7.14, Access road analysis

Access road analysis
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.

Susitna Hydroelectric Project.

Terrestrial Environmental Specialists.
Publisher:Terrestrial Environmental Specialists,
Report Numbers:APA 1323

SUS 336
Series:Document (Susitna Hydroelectric Project) ; no. 1323.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:This procedure manual describes the research methodology for conducting a study for the proposed Susitna Hydroelectric Project. The purposes of the study are to select an environmentally sound access road to the dam sites planned for the Susitna Hydroelectric Project and to provide an impact assessment of the preferred access route and of dam facilities such as borrow areas and connecting haul roads.
Physical Description:[iii], 3, [1] leaves ; 28 cm.
Notes:At head of title: Alaska Power Authority, Susitna Hydroelectric Project.