Task 2, Surveys and site facilities. Subtask 2.10, Access planning study /

"The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertica...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Task 2, Surveys and site facilities. Subtask 2.10, Access planning study

Surveys and site facilities. Subtask 2.10, Access planning study

Subtask 2.10. Access planning study

Access planning study
Corporate Contributor(s):Alaska Power Authority.

Susitna Hydroelectric Project.

R & M Consultants.

Acres American Incorporated.
Publisher:R & M Consultants,
Report Numbers:SUS 82
Edition:Prelim. 2nd printing.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03140cam a2200541Ia 4500
001 376042
003 SIRSI
005 20120322093252.0
007 he bm||||b|c|
007 cr cn||||a||||
008 990921s1981 akuabe t 000 0 eng d
035 |a (OCoLC)42408098 
040 |a UAF  |c UAF  |d RLA 
049 |a RLAA 
088 |a SUS 82 
090 |a TK1425.S8  |b S9 no. 82 
090 |a TK1425.S9  |b A43 1981 
245 0 0 |a Task 2, Surveys and site facilities.  |n Subtask 2.10,  |p Access planning study /  |c prepared for Acres American, Incorporated ; prepared by R & M Consultants, Inc. 
246 1 4 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Task 2,  |p Surveys and site facilities.  |n Subtask 2.10,  |p Access planning study 
246 3 0 |a Surveys and site facilities.  |n Subtask 2.10,  |p Access planning study 
246 3 0 |a Subtask 2.10.  |p Access planning study 
246 3 0 |a Access planning study 
250 |a Prelim. 2nd printing. 
260 |a [Anchorage, Alaska?] :  |b R & M Consultants,  |c [1981] 
300 |a 278 leaves in various foliations :  |b ill., maps, plans ;  |c 28 cm. 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a "October 1981." 
510 3 |a Assigned SUS document no. 82 in the Susitna Aquatic Impact Assessment Project bibliography. 
510 3 |a The final version of this preliminary work is assigned APA Document no. 3 (as well as APA 1208) in the Susitna Hydroelectric Project document index, and is assigned SUS document no. SUS 57. 
530 |a Available also in microfiche format and electronic format on the Internet. 
520 |a "The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertical alignment and the selection and analysis of alternative alignments which serve the needs of the entire project."--Leaves 1-2, 1-3. 
505 0 |a Introduction -- Summary -- Scope of work -- Previous studies -- Project design -- Project schedule -- Logistics requirements -- Access route design parameters -- Corridor selection -- Access plans -- Conclusions and recommendations -- Appendices. 
650 0 |a Transportation  |z Alaska  |z Susitna River Valley  |x Planning. 
650 0 |a Route surveying  |z Alaska  |z Susitna River Valley. 
650 0 |a Roads  |z Alaska  |z Susitna River Valley  |x Design and construction. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River Valley  |x Design and construction. 
650 4 |a Access roads  |z Alaska  |z Susitna River Valley. 
650 0 |a Dams  |x Access roads  |z Alaska  |z Susitna River Valley. 
710 2 |a Alaska Power Authority. 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a R & M Consultants. 
710 2 |a Acres American Incorporated. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/SUS/0/SUS82.pdf  |z ARLIS Document Server 
901 |a 3755 
596 |a 9 10 
098 |a SUS 00082