Task 2, Surveys and site facilities. Subtask 2.10, Access planning study /

"The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertica...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Task 2, Surveys and site facilities. Subtask 2.10, Access planning study

Surveys and site facilities. Subtask 2.10, Access planning study

Subtask 2.10. Access planning study

Access planning study
Corporate Contributor(s):Alaska Power Authority.

Susitna Hydroelectric Project.

R & M Consultants.

Acres American Incorporated.
Publisher:R & M Consultants,
Report Numbers:SUS 82
Edition:Prelim. 2nd printing.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"The Access Planning Study involved the selection of potential highway and railroad alignments that would serve the dam sites selected for detailed study. The process involved aerial reconnaissance of the potential corridors, definition of the parameters which control the horizontal and vertical alignment and the selection and analysis of alternative alignments which serve the needs of the entire project."--Leaves 1-2, 1-3.
Physical Description:278 leaves in various foliations : ill., maps, plans ; 28 cm.
Notes:At head of title: Alaska Power Authority, Susitna Hydroelectric Project.

"October 1981."