Social Science Program study tasks, fiscal year 1985 /
"Although the license application has been accepted by the FERC for review, various social science program studies and activities are still needed to ensure that the licensing process proceeds on schedule. This document outlines the study tasks proposed for Fiscal Year 1985 (FY85). ... The Soci...
Saved in:
Alternate Title: | Draft, Social Science Program study tasks, fiscal year 1985 Susitna Hydroelectric Project. Social Science Program study tasks, fiscal year 1985 Susitna Hydroelectric Project, fiscal year 1985 Social Science Program study tasks |
---|---|
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. Susitna Hydroelectric Project. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 4002 |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02836cam a2200529Ia 4500 | ||
---|---|---|---|
001 | 376034 | ||
003 | SIRSI | ||
005 | 20160531015150.0 | ||
007 | ta | ||
007 | cr bn||||a|||| | ||
008 | 030709s1984 aku t s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d OCLCQ |d RLA |d OCLCF |d OCLCQ |d RLA | ||
035 | |a (OCoLC)52584203 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 4002 | |
088 | |a APA 4002 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Social Science Program study tasks, fiscal year 1985 / |c report by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. |
246 | 3 | |a Draft, Social Science Program study tasks, fiscal year 1985 | |
246 | 1 | 4 | |a Susitna Hydroelectric Project. |p Social Science Program study tasks, fiscal year 1985 |
246 | 1 | 6 | |a Susitna Hydroelectric Project, fiscal year 1985 Social Science Program study tasks |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1984] | ||
300 | |a ii, 34 leaves ; |c 28 cm | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
500 | |a At head of title: Susitna Hydroelectric Project, draft. | ||
513 | |a Draft report. | ||
500 | |a "April 1984"--Cover. | ||
510 | 3 | |a Alaska Resources Library and Information Services has assigned APA no. 4002 to this document for the Susitna Hydroelectric Project collection. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a "Although the license application has been accepted by the FERC for review, various social science program studies and activities are still needed to ensure that the licensing process proceeds on schedule. This document outlines the study tasks proposed for Fiscal Year 1985 (FY85). ... The Social Science Program is comprised of the following five subtasks: cultural resources, socioeconomics, recreation, aesthetics, and land use."--Leaf 1. | ||
505 | 0 | |a Introduction -- Long term goals of the Power Authority -- Social Science Study Team participants -- FY85 study task descriptions and prioritization. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Social aspects. |
650 | 0 | |a Hydroelectric power plants |x Social aspects |z Alaska |z Susitna River. | |
651 | 0 | |a Susitna River (Alaska) | |
610 | 2 | 7 | |a Susitna Hydroelectric Project. |2 fast |0 (OCoLC)fst00592845 |
650 | 7 | |a Hydroelectric power plants |x Social aspects. |2 fast |0 (OCoLC)fst00964969 | |
650 | 7 | |a Social aspects. |2 fast |0 (OCoLC)fst01354981 | |
651 | 7 | |a Alaska |z Susitna River. |2 fast |0 (OCoLC)fst01246005 | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/40/APA4002.pdf |z ARLIS Document Server |
901 | |a 3755 |c TK1425.S8A23 no.4002 |f orig | ||
596 | |a 9 10 | ||
098 | |a APA 04002 |