Social Science Program study tasks, fiscal year 1985 /

"Although the license application has been accepted by the FERC for review, various social science program studies and activities are still needed to ensure that the licensing process proceeds on schedule. This document outlines the study tasks proposed for Fiscal Year 1985 (FY85). ... The Soci...

Full description

Saved in:
Bibliographic Details
Alternate Title:Draft, Social Science Program study tasks, fiscal year 1985

Susitna Hydroelectric Project. Social Science Program study tasks, fiscal year 1985

Susitna Hydroelectric Project, fiscal year 1985 Social Science Program study tasks
Corporate Contributor(s):HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.

Susitna Hydroelectric Project.
Publisher:Alaska Power Authority,
Report Numbers:APA 4002
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02836cam a2200529Ia 4500
001 376034
003 SIRSI
005 20160531015150.0
007 ta
007 cr bn||||a||||
008 030709s1984 aku t s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d OCLCQ  |d RLA  |d OCLCF  |d OCLCQ  |d RLA 
035 |a (OCoLC)52584203 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 4002 
088 |a APA 4002 
049 |a RLAA 
245 0 0 |a Social Science Program study tasks, fiscal year 1985 /  |c report by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. 
246 3 |a Draft, Social Science Program study tasks, fiscal year 1985 
246 1 4 |a Susitna Hydroelectric Project.  |p Social Science Program study tasks, fiscal year 1985 
246 1 6 |a Susitna Hydroelectric Project, fiscal year 1985 Social Science Program study tasks 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1984] 
300 |a ii, 34 leaves ;  |c 28 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
500 |a At head of title: Susitna Hydroelectric Project, draft. 
513 |a Draft report. 
500 |a "April 1984"--Cover. 
510 3 |a Alaska Resources Library and Information Services has assigned APA no. 4002 to this document for the Susitna Hydroelectric Project collection. 
530 |a Available also in electronic format on the Internet. 
520 |a "Although the license application has been accepted by the FERC for review, various social science program studies and activities are still needed to ensure that the licensing process proceeds on schedule. This document outlines the study tasks proposed for Fiscal Year 1985 (FY85). ... The Social Science Program is comprised of the following five subtasks: cultural resources, socioeconomics, recreation, aesthetics, and land use."--Leaf 1. 
505 0 |a Introduction -- Long term goals of the Power Authority -- Social Science Study Team participants -- FY85 study task descriptions and prioritization. 
610 2 0 |a Susitna Hydroelectric Project  |x Social aspects. 
650 0 |a Hydroelectric power plants  |x Social aspects  |z Alaska  |z Susitna River. 
651 0 |a Susitna River (Alaska) 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
650 7 |a Hydroelectric power plants  |x Social aspects.  |2 fast  |0 (OCoLC)fst00964969 
650 7 |a Social aspects.  |2 fast  |0 (OCoLC)fst01354981 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a Alaska Power Authority. 
710 2 |a Susitna Hydroelectric Project. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/40/APA4002.pdf  |z ARLIS Document Server 
901 |a 3755  |c TK1425.S8A23 no.4002  |f orig 
596 |a 9 10 
098 |a APA 04002