A framework for the assessment of chinook salmon rearing in the middle Susitna River under altered flow, temperature and sediment regimes : report /

"The purpose of this preliminary draft report is to provide a framework for evaluating chinook rearing in the middle Susitna River under with-project conditions when further data become available and appropriate analyses are completed. At present, this report contains an overview of juvenile ch...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. A framework for the assessment of chinook salmon rearing in the middle Susitna River under altered flow, temperature and sediment regimes
Main Author: Milner, A. M. 1952-
Corporate Contributor(s):E. Woody Trihey and Associates.

HARZA-EBASCO Susitna Joint Venture.

Susitna Hydroelectric Project.

United States. Federal Energy Regulatory Commission.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:SUS 503
Series:Document (Susitna Hydroelectric Project)
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03384cam a2200541Ia 4500
001 375337
003 SIRSI
007 ta
005 20120711094907.0
007 he bmu---bbca
007 cr bn||||a||||
008 030710s1984 akuab bt s000 0 eng d
035 |a (OCoLC)52589319 
040 |a RLA  |c RLA  |d OCLCQ  |d OCLCG  |d RLA 
049 |a RLAA 
088 |a SUS 503 
090 |a TK1425.S8  |b S9 no. 503 
100 1 |a Milner, A. M.  |q (Alexander M.),  |d 1952- 
245 1 2 |a A framework for the assessment of chinook salmon rearing in the middle Susitna River under altered flow, temperature and sediment regimes :  |b report /  |c by E. Woody Trihey & Associates ; Alexander M. Milner ; under contract to Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. 
246 3 |a Susitna Hydroelectric Project.  |p A framework for the assessment of chinook salmon rearing in the middle Susitna River under altered flow, temperature and sediment regimes 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1984] 
300 |a [3], 69 leaves (some folded) :  |b ill., map ;  |c 28 cm. 
490 1 |a Document ;  |v no. [unnumbered] 
500 |a At head of title: Susitna Hydroelectric Project. 
513 |a Draft report. 
500 |a "April 1984." 
500 |a "April 1985"--Cover. 
500 |a "Federal Energy Regulatory Commission Project no. 7114"--Cover. 
500 |a The Document series statement appears on item, but the series number is crossed out. This title is not found in the Susitna Hydroelectric Project document index. 
510 3 |a Assigned number SUS 503 in the Susitna Aquatic Impact Assessment Project bibliography. 
530 |a Available also in microfiche format and electronic format on the Internet. 
520 |a "The purpose of this preliminary draft report is to provide a framework for evaluating chinook rearing in the middle Susitna River under with-project conditions when further data become available and appropriate analyses are completed. At present, this report contains an overview of juvenile chinook studies to date, a comparative evaluation of the significance of the principal environmental factors influencing the rearing of juvenile chinook, and an extensive literature review."--Leaf 6. 
505 0 |a Introduction -- Overview of chinook salmon escapement of the Susitna River drainage -- Distribution of rearing juvenile chinook salmon in the middle Susitna River -- Factors that influence juvenile rearing chinook salmon in the middle Susitna River -- Evaluation of with-project conditions. 
504 |a Includes bibliographical references (leaves 62-69). 
650 0 |a Chinook salmon  |x Effect of dams on  |z Alaska  |z Susitna River. 
650 0 |a Chinook salmon  |x Effect of habitat modification on  |z Alaska  |z Susitna River. 
650 0 |a Stream measurements  |z Alaska  |z Susitna River. 
610 2 0 |a Susitna Hydroelectric Project  |x Environmental aspects. 
710 2 |a E. Woody Trihey and Associates. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a Susitna Hydroelectric Project. 
710 1 |a United States.  |b Federal Energy Regulatory Commission. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/SUS/5/SUS503.pdf  |z ARLIS Document Server 
596 |a 9 10 
098 |a SUS 00503