Weekly stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station three stage project /
"Thirty-three complete water years are contained in the period of simulation."--Page 1.
Saved in:
Alternate Title: | Weekly stream flows and flow duration curves for the Susitna River basin three stage project |
---|---|
Corporate Contributor(s): | Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. Susitna Hydroelectric Project. United States. Federal Energy Regulatory Commission. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 3004 APA 3005 SUS 599 SUS 600 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 3004-3005. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03035cam a2200673Ia 4500 | ||
---|---|---|---|
001 | 375125 | ||
003 | SIRSI | ||
005 | 20160428081111.0 | ||
007 | ta | ||
007 | he bmu---bbca | ||
007 | cr bn||||a|||| | ||
008 | 030701s1985 akuad bt s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d OCLCQ |d RLA |d OCLCA |d OCLCF |d OCLCQ |d RLA | ||
035 | |a (OCoLC)52536014 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b F472 no. 3004-3005 | |
088 | |a APA 3004 | ||
088 | |a APA 3005 | ||
088 | |a SUS 599 | ||
088 | |a SUS 600 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Weekly stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station three stage project / |c prepared by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. |
246 | 1 | 6 | |a Weekly stream flows and flow duration curves for the Susitna River basin three stage project |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1985] | ||
300 | |a 2 volumes : |b illustrations ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Document ; |v no. 3004-3005 | |
500 | |a Chiefly charts and tables. | ||
500 | |a At head of title: Susitna Hydroelectric Project. | ||
513 | |a Final report. | ||
500 | |a "Susitna file no. 42.2.3." | ||
500 | |a "December 1985." | ||
500 | |a "Federal Energy Regulatory Commission project no. 7114"--Cover. | ||
510 | 3 | |a Assigned APA document numbers 3004 and 3005 in Susitna Hydroelectric Project document index. | |
510 | 3 | |a Assigned numbers SUS 599 and 600 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in microfiche format and electronic format on the Internet. | ||
520 | |a "Thirty-three complete water years are contained in the period of simulation."--Page 1. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
505 | 0 | |a v. 1. Stages I and II. (APA 3004 ; SUS 599) -- v. 2. Stage III. (APA 3005 ; SUS 600). | |
504 | |a Includes bibliographical references (both vols.: page 6). | ||
650 | 0 | |a Stream measurements |z Alaska |z Susitna River. | |
651 | 0 | |a Susitna River (Alaska) | |
610 | 2 | 7 | |a Susitna Hydroelectric Project. |2 fast |0 (OCoLC)fst00592845 |
650 | 7 | |a Stream measurements. |2 fast |0 (OCoLC)fst01134581 | |
651 | 7 | |a Alaska |z Susitna River. |2 fast |0 (OCoLC)fst01246005 | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 1 | |a United States. |b Federal Energy Regulatory Commission. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 3004-3005. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/30/APA3004.pdf |3 Direct link to the first volume (Stages I and II). |z ARLIS Document Server |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/30/APA3004.html |3 List of all volumes. |z ARLIS Document Server |
098 | |a APA 03004 | ||
596 | |a 9 10 | ||
098 | |a SUS 00599 | ||
098 | |a SUS 00600 | ||
098 | |a APA 03005 |