Weekly stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station three stage project /

"Thirty-three complete water years are contained in the period of simulation."--Page 1.

Saved in:
Bibliographic Details
Alternate Title:Weekly stream flows and flow duration curves for the Susitna River basin three stage project
Corporate Contributor(s):Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

Susitna Hydroelectric Project.

United States. Federal Energy Regulatory Commission.
Publisher:Alaska Power Authority,
Report Numbers:APA 3004

APA 3005

SUS 599

SUS 600
Series:Document (Susitna Hydroelectric Project) ; no. 3004-3005.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 03035cam a2200673Ia 4500
001 375125
003 SIRSI
005 20160428081111.0
007 ta
007 he bmu---bbca
007 cr bn||||a||||
008 030701s1985 akuad bt s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d OCLCQ  |d RLA  |d OCLCA  |d OCLCF  |d OCLCQ  |d RLA 
035 |a (OCoLC)52536014 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b F472 no. 3004-3005 
088 |a APA 3004 
088 |a APA 3005 
088 |a SUS 599 
088 |a SUS 600 
049 |a RLAA 
245 0 0 |a Weekly stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station three stage project /  |c prepared by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. 
246 1 6 |a Weekly stream flows and flow duration curves for the Susitna River basin three stage project 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1985] 
300 |a 2 volumes :  |b illustrations ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Document ;  |v no. 3004-3005 
500 |a Chiefly charts and tables. 
500 |a At head of title: Susitna Hydroelectric Project. 
513 |a Final report. 
500 |a "Susitna file no. 42.2.3." 
500 |a "December 1985." 
500 |a "Federal Energy Regulatory Commission project no. 7114"--Cover. 
510 3 |a Assigned APA document numbers 3004 and 3005 in Susitna Hydroelectric Project document index. 
510 3 |a Assigned numbers SUS 599 and 600 in the Susitna Aquatic Impact Assessment Project bibliography. 
530 |a Available also in microfiche format and electronic format on the Internet. 
520 |a "Thirty-three complete water years are contained in the period of simulation."--Page 1. 
610 2 0 |a Susitna Hydroelectric Project. 
505 0 |a v. 1. Stages I and II. (APA 3004 ; SUS 599) -- v. 2. Stage III. (APA 3005 ; SUS 600). 
504 |a Includes bibliographical references (both vols.: page 6). 
650 0 |a Stream measurements  |z Alaska  |z Susitna River. 
651 0 |a Susitna River (Alaska) 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
650 7 |a Stream measurements.  |2 fast  |0 (OCoLC)fst01134581 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
710 2 |a Alaska Power Authority. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a Susitna Hydroelectric Project. 
710 1 |a United States.  |b Federal Energy Regulatory Commission. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 3004-3005. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/30/APA3004.pdf  |3 Direct link to the first volume (Stages I and II).  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/30/APA3004.html  |3 List of all volumes.  |z ARLIS Document Server 
098 |a APA 03004 
596 |a 9 10 
098 |a SUS 00599 
098 |a SUS 00600 
098 |a APA 03005