Weekly stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station three stage project /
"Thirty-three complete water years are contained in the period of simulation."--Page 1.
Saved in:
Alternate Title: | Weekly stream flows and flow duration curves for the Susitna River basin three stage project |
---|---|
Corporate Contributor(s): | Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. Susitna Hydroelectric Project. United States. Federal Energy Regulatory Commission. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 3004 APA 3005 SUS 599 SUS 600 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 3004-3005. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | "Thirty-three complete water years are contained in the period of simulation."--Page 1. |
---|---|
Physical Description: | 2 volumes : illustrations ; 28 cm. |
Notes: | Chiefly charts and tables. At head of title: Susitna Hydroelectric Project. "Susitna file no. 42.2.3." "December 1985." "Federal Energy Regulatory Commission project no. 7114"--Cover. |
Report Type: | Final report. |
Bibliography: | Includes bibliographical references (both vols.: page 6). |