Weekly stream flows and flow duration curves at Watana, Devil Canyon, Gold Creek, Sunshine and Susitna Station three stage project /

"Thirty-three complete water years are contained in the period of simulation."--Page 1.

Saved in:
Bibliographic Details
Alternate Title:Weekly stream flows and flow duration curves for the Susitna River basin three stage project
Corporate Contributor(s):Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

Susitna Hydroelectric Project.

United States. Federal Energy Regulatory Commission.
Publisher:Alaska Power Authority,
Report Numbers:APA 3004

APA 3005

SUS 599

SUS 600
Series:Document (Susitna Hydroelectric Project) ; no. 3004-3005.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:"Thirty-three complete water years are contained in the period of simulation."--Page 1.
Physical Description:2 volumes : illustrations ; 28 cm.
Notes:Chiefly charts and tables.

At head of title: Susitna Hydroelectric Project.

"Susitna file no. 42.2.3."

"December 1985."

"Federal Energy Regulatory Commission project no. 7114"--Cover.
Report Type:Final report.
Bibliography:Includes bibliographical references (both vols.: page 6).