Physical processes of the middle Susitna River : report /

"This report describes naturally occurring processes within the Talkeetna-to-Devil Canyon river reach pertinent to evaluating project effects on riverine fish habitat."--P. xi.

Saved in:
Bibliographic Details
Alternate Title:Physical processes.
Corporate Contributor(s):Susitna Hydroelectric Project.

R & M Consultants.

Woodward-Clyde Consultants.

HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 2828

SUS 542
Original Source:Physical processes.
Edition:[Final].
Series:Document (Susitna Hydroelectric Project) ; no. 2828.
Instream flow relationships report series, technical report ; no. 2.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Reservoir sedimentation
  • Channel stability
  • Slough hydrology
  • Summary.