Physical processes of the middle Susitna River : report /

"This report describes naturally occurring processes within the Talkeetna-to-Devil Canyon river reach pertinent to evaluating project effects on riverine fish habitat."--P. xi.

Saved in:
Bibliographic Details
Alternate Title:Physical processes.
Corporate Contributor(s):Susitna Hydroelectric Project.

R & M Consultants.

Woodward-Clyde Consultants.

HARZA-EBASCO Susitna Joint Venture.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 2828

SUS 542
Original Source:Physical processes.
Edition:[Final].
Series:Document (Susitna Hydroelectric Project) ; no. 2828.
Instream flow relationships report series, technical report ; no. 2.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"This report describes naturally occurring processes within the Talkeetna-to-Devil Canyon river reach pertinent to evaluating project effects on riverine fish habitat."--P. xi.
Physical Description:137 leaves in various pagings : ill., maps ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

Draft version has title: Physical processes.

"June 1985."

"Federal Energy Regulatory Commission Project No. 7114"--Cover.

"Susitna file no. 4.2.2.1."

This document is one of four works intended to support "Instream flow relationships report. Volume no. 1" (APA document no. 3060). See the preface.
Report Type:Final report.
Original Source:Physical processes.
Bibliography:Includes bibliographical references (leaves 6-1 - 6-11).