Effects on navigation /
"Operation of the Susitna Hydroelectric Project will alter the flow regime below the projects, decreasing flows in summer as water is stored to fill the reservoirs, and increasing flows in the winter in order to meet power demand. Changes in the flow and sediment regime cause by operation of th...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Effects on navigation |
---|---|
Main Author: | |
Additional Author(s): | Butera, Bob. |
Corporate Contributor(s): | Alaska Power Authority. HARZA-EBASCO Susitna Joint Venture. R & M Consultants. Susitna Hydroelectric Project. United States. Federal Energy Regulatory Commission. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 2746 SUS 534 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 2746. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02596cam a2200565Ia 4500 | ||
---|---|---|---|
001 | 375041 | ||
003 | SIRSI | ||
007 | ta | ||
005 | 20120710102648.0 | ||
007 | he bmu---bbca | ||
007 | cr bn||||a|||| | ||
008 | 030627s1985 akuab bt s000 0 eng d | ||
035 | |a (OCoLC)52516968 | ||
040 | |a RLA |c RLA |d OCLCQ |d RLA | ||
049 | |a RLAA | ||
088 | |a APA 2746 | ||
088 | |a SUS 534 | ||
090 | |a TK1425.S8 |b F472 no. 2746 | ||
100 | 1 | |a Bredthauer, S. R. | |
245 | 1 | 0 | |a Effects on navigation / |c prepared by R & M Consultants, Inc. ; Stephen R. Bredthauer, Bob Butera ; under contract to Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. |
246 | 3 | |a Susitna Hydroelectric Project. |p Effects on navigation | |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1985] | ||
500 | |a At head of title: Susitna Hydroelectric Project. | ||
300 | |a ix, 112 leaves : |b ill., maps ; |c 28 cm. | ||
490 | 1 | |a Document ; |v no. 2746 | |
513 | |a Final report. | ||
500 | |a "June 1985." | ||
500 | |a "Susitna file no. 4.2.2.1." | ||
500 | |a "Federal Energy Regulatory Commission project no. 7114"--Cover. | ||
510 | 3 | |a Assigned APA Document no. 2746 in Susitna Hydroelectric Project document index. | |
510 | 3 | |a Assigned number SUS 534 in the the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in microfiche format and electronic format on the Internet. | ||
650 | 0 | |a Streamflow |z Alaska |z Susitna River. | |
520 | |a "Operation of the Susitna Hydroelectric Project will alter the flow regime below the projects, decreasing flows in summer as water is stored to fill the reservoirs, and increasing flows in the winter in order to meet power demand. Changes in the flow and sediment regime cause by operation of the project are not expected to significantly affect navigation downstream of the projects."--P. 1. | ||
504 | |a Includes bibliographical references (p. 43-45). | ||
651 | 0 | |a Susitna River (Alaska) |x Navigation. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
700 | 1 | |a Butera, Bob. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a R & M Consultants. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 1 | |a United States. |b Federal Energy Regulatory Commission. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 2746. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/27/APA2746.pdf |z ARLIS Document Server |
901 | |a 3755 |f orig | ||
596 | |a 9 10 11 | ||
098 | |a SUS 00534 | ||
098 | |a APA 02746 |