Effects on navigation /

"Operation of the Susitna Hydroelectric Project will alter the flow regime below the projects, decreasing flows in summer as water is stored to fill the reservoirs, and increasing flows in the winter in order to meet power demand. Changes in the flow and sediment regime cause by operation of th...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Effects on navigation
Main Author: Bredthauer, S. R.
Additional Author(s):Butera, Bob.
Corporate Contributor(s):Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

R & M Consultants.

Susitna Hydroelectric Project.

United States. Federal Energy Regulatory Commission.
Publisher:Alaska Power Authority,
Report Numbers:APA 2746

SUS 534
Series:Document (Susitna Hydroelectric Project) ; no. 2746.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02596cam a2200565Ia 4500
001 375041
003 SIRSI
007 ta
005 20120710102648.0
007 he bmu---bbca
007 cr bn||||a||||
008 030627s1985 akuab bt s000 0 eng d
035 |a (OCoLC)52516968 
040 |a RLA  |c RLA  |d OCLCQ  |d RLA 
049 |a RLAA 
088 |a APA 2746 
088 |a SUS 534 
090 |a TK1425.S8  |b F472 no. 2746 
100 1 |a Bredthauer, S. R. 
245 1 0 |a Effects on navigation /  |c prepared by R & M Consultants, Inc. ; Stephen R. Bredthauer, Bob Butera ; under contract to Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. 
246 3 |a Susitna Hydroelectric Project.  |p Effects on navigation 
260 |a [Anchorage, Alaska] :  |b Alaska Power Authority,  |c [1985] 
500 |a At head of title: Susitna Hydroelectric Project. 
300 |a ix, 112 leaves :  |b ill., maps ;  |c 28 cm. 
490 1 |a Document ;  |v no. 2746 
513 |a Final report. 
500 |a "June 1985." 
500 |a "Susitna file no. 4.2.2.1." 
500 |a "Federal Energy Regulatory Commission project no. 7114"--Cover. 
510 3 |a Assigned APA Document no. 2746 in Susitna Hydroelectric Project document index. 
510 3 |a Assigned number SUS 534 in the the Susitna Aquatic Impact Assessment Project bibliography. 
530 |a Available also in microfiche format and electronic format on the Internet. 
650 0 |a Streamflow  |z Alaska  |z Susitna River. 
520 |a "Operation of the Susitna Hydroelectric Project will alter the flow regime below the projects, decreasing flows in summer as water is stored to fill the reservoirs, and increasing flows in the winter in order to meet power demand. Changes in the flow and sediment regime cause by operation of the project are not expected to significantly affect navigation downstream of the projects."--P. 1. 
504 |a Includes bibliographical references (p. 43-45). 
651 0 |a Susitna River (Alaska)  |x Navigation. 
610 2 0 |a Susitna Hydroelectric Project. 
700 1 |a Butera, Bob. 
710 2 |a Alaska Power Authority. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
710 2 |a R & M Consultants. 
710 2 |a Susitna Hydroelectric Project. 
710 1 |a United States.  |b Federal Energy Regulatory Commission. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 2746. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/27/APA2746.pdf  |z ARLIS Document Server 
901 |a 3755  |f orig 
596 |a 9 10 11 
098 |a SUS 00534 
098 |a APA 02746