Effects on navigation /

"Operation of the Susitna Hydroelectric Project will alter the flow regime below the projects, decreasing flows in summer as water is stored to fill the reservoirs, and increasing flows in the winter in order to meet power demand. Changes in the flow and sediment regime cause by operation of th...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Effects on navigation
Main Author: Bredthauer, S. R.
Additional Author(s):Butera, Bob.
Corporate Contributor(s):Alaska Power Authority.

HARZA-EBASCO Susitna Joint Venture.

R & M Consultants.

Susitna Hydroelectric Project.

United States. Federal Energy Regulatory Commission.
Publisher:Alaska Power Authority,
Report Numbers:APA 2746

SUS 534
Series:Document (Susitna Hydroelectric Project) ; no. 2746.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Summary:"Operation of the Susitna Hydroelectric Project will alter the flow regime below the projects, decreasing flows in summer as water is stored to fill the reservoirs, and increasing flows in the winter in order to meet power demand. Changes in the flow and sediment regime cause by operation of the project are not expected to significantly affect navigation downstream of the projects."--P. 1.
Physical Description:ix, 112 leaves : ill., maps ; 28 cm.
Notes:At head of title: Susitna Hydroelectric Project.

"June 1985."

"Susitna file no. 4.2.2.1."

"Federal Energy Regulatory Commission project no. 7114"--Cover.
Report Type:Final report.
Bibliography:Includes bibliographical references (p. 43-45).