Susitna Hydroelectric Project. Plan of study /

Saved in:
Bibliographic Details
Alternate Title:Plan of study

Alaska Power Authority, Susitna Hydroelectric Project. Plan of study
Corporate Contributor(s):Susitna Hydroelectric Project.

Alaska Power Authority.

Acres American Incorporated.

Cook Inlet Region, Inc.

Holmes & Narver.

R & M Consultants.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 1391

APA 1392

APA 1393

APA 1394

APA 3336

APA 3337
Series:Document (Susitna Hydroelectric Project) ; no. 1391-1394.
Document (Susitna Hydroelectric Project) ; no. 3336-3337.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 03507cam a2200757Ia 4500
001 374924
003 SIRSI
005 20160425084248.0
007 ta
007 cr bn||||a||||
008 030625s1979 akuab t s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d OCLCQ  |d RLA  |d OCLCF  |d OCLCQ  |d RLA 
035 |a (OCoLC)52505835 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 1391,etc. 
088 |a APA 1391 
088 |a APA 1392 
088 |a APA 1393 
088 |a APA 1394 
088 |a APA 3336 
088 |a APA 3337 
049 |a RLAA 
245 0 0 |a Susitna Hydroelectric Project.  |p Plan of study /  |c Acres American Incorported in association with Cook Inlet Region Inc./Holmes & Narver Inc. [and others]. 
246 3 0 |a Plan of study 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |p Plan of study 
260 |a [Alaska] :  |b Alaska Power Authority,  |c [1979] 
300 |a 6 volumes :  |b illustrations, maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 3336-3337 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a "September 1979." 
500 |a Series statement from label on covers of volume1 and 2 of part C. 
510 3 |a The executive summary, parts A, B, and v. 3 of C were assigned APA Document numbers 1391-1394 in Susitna Hydroelectric Project document index. Volume 1 and 2 of part C were assigned APA Document numbers 3336-3337. 
530 |a Available also in electronic format on the Internet. 
505 0 0 |t Executive summary.  |g (APA 1394) --  |g pt. A.  |t Plan of study.  |g (APA 1391) -- pt. B.  |t Implementation of the plan of study.  |g (APA 1392) -- pt. C., v. 1.  |t Supplemental information.  |g (APA 3336) --  |g pt. C., v. 2.  |t Company experience.  |g (APA 3337) --  |g pt. C., v. 3.  |t Environmental appendix.  |g (APA 1393). 
610 2 0 |a Susitna Hydroelectric Project  |x Planning. 
650 0 |a Hydroelectric power plants  |z Alaska  |z Susitna River  |x Planning. 
650 0 |a Dams  |z Alaska  |z Susitna River  |x Planning. 
651 0 |a Susitna River (Alaska)  |x Power utilization  |x Planning. 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
650 7 |a Dams  |x Planning.  |2 fast  |0 (OCoLC)fst00887365 
650 7 |a Hydroelectric power plants  |x Planning.  |2 fast  |0 (OCoLC)fst00964961 
650 7 |a Planning.  |2 fast  |0 (OCoLC)fst01065224 
650 7 |a Water-power  |x Planning.  |2 fast  |0 (OCoLC)fst01355318 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
710 2 |a Susitna Hydroelectric Project. 
710 2 |a Alaska Power Authority. 
710 2 |a Acres American Incorporated. 
710 2 |a Cook Inlet Region, Inc. 
710 2 |a Holmes & Narver. 
710 2 |a R & M Consultants. 
710 2 |a HARZA-EBASCO Susitna Joint Venture.  |5 AkARLIS 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1391-1394. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 3336-3337. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/13/APA1391.pdf  |3 Direct link to the part A (Plan of study).  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/13/APA1391.html  |3 List of all volumes.  |z ARLIS Document Server 
901 |a 3755  |c TK1425.S8A23  |f orig 
596 |a 9 10 
098 |a APA 01391 
098 |a APA 01392 
098 |a APA 01393 
098 |a APA 01394 
098 |a APA 03336 
098 |a APA 03337