Aesthetic resources study, Study plan Section 12.6, 2014 Study Implementation Report /

This study is being conducted as part of a series of studies to be submitted to the Federal Energy Regulatory Commission for licensing of the Susitna-Watana Hydroelectric Project in Alaska. The objectives for this study are to inventory and document baseline aesthetic (e.g. visual and auditory) cond...

Full description

Saved in:
Bibliographic Details
Alternate Title:2014 Study Implementation Report. Aesthetic resources study (12.6)

Aesthetic resources study, Study plan Section 12.6, Initial Study Report.

Aesthetic resources study, Study plan Section 12.6, Soundscape technical memorandum.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

Alaska Energy Authority,

AECOM (Firm),
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 289
Original Source:Preceded by (expression): Aesthetic resources study, Study plan Section 12.6, Initial Study Report.

Aesthetic resources study, Study plan Section 12.6, Soundscape technical memorandum.
Series:Susitna-Watana Hydroelectric Project document ; no. 289.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 05052cam a2200613Ia 4500
001 2955149
003 SIRSI
005 20170125205101.0
007 ta
007 cr cn||a||||||
008 170125s2015 akuab bt s000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)970011704 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 289 sec. 12.6 
088 |a SuWa 289 
098 |a SuWa 00289 
245 0 0 |a Aesthetic resources study, Study plan Section 12.6, 2014 Study Implementation Report /  |c prepared by AECOM. 
246 1 7 |a 2014 Study Implementation Report.  |p Aesthetic resources study (12.6) 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2015] 
300 |a 147 pages in various pagings :  |b col. ill., 3 color maps ;  |c 28 cm. and 28 x 44 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 289 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a "Prepared for Alaska Energy Authority." 
500 |a "October 2015." 
513 |a November 2015; Study Completion and 2014/2015 Implementation Reports. 
500 |a ARLIS assigned report number: SuWa 289. 
510 3 |a Listed in December 2015 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: November 2015; Study Completion and 2014/2015 Implementation Reports. 
580 |a Preceded by: Aesthetic resources study, Study plan Section 12.6, Initial Study Report / prepared by URS Corporation. -- June 2014 (but Part D is dated November 2015). -- (Susitna-Watana Hydroelectric Project document ; no. 223). 
500 |a Attachment 1 has its own title page with title: Aesthetic resources study, Study plan Section 12.6, Soundscape technical memorandum / prepared by AECOM. -- September 2015. 
500 |a Running title of Attachment 1: Soundscape technical memorandum, Aesthetic resources study (12.6). 
530 |a Available also in electronic format on the Internet. 
520 |a This study is being conducted as part of a series of studies to be submitted to the Federal Energy Regulatory Commission for licensing of the Susitna-Watana Hydroelectric Project in Alaska. The objectives for this study are to inventory and document baseline aesthetic (e.g. visual and auditory) conditions within the study area and evaluate the potential effects to aesthetic resources that may result from construction and operation of the proposed project. The analysis will focus on assessing these potential effects and will help identify potential design and other mitigation options. The primary study area is defined as a 30-mile buffer zone surrounding Project components (dam, reservoir, transmission lines, access corridors, dam, and camp facilities, and borrow sites). A secondary study area encompasses a region that overlaps much of the primary area, but covers an area bounded by the George Parks Highway (western boundary), the Denali Highway (northern boundary), the Richardson Highway (eastern boundary), and the Glenn Highway (southern boundary). This report describes the methods and results of the efforts made by Alaska Energy Authority during 2014 in pursuing this study. It consists mainly the of soundscape study, which appears in completed form in this volume. The purpose of that study was to collect baseline data on the existing ambient sound environment in the study area for assessment of potential change as a result of construction and operation of the proposed project. 
505 0 |a 2014 Study Implementation Report [main report] -- Attachment 1. Soundscape technical memorandum. 
650 0 |a Landscape protection  |z Alaska  |z Susitna River Region. 
504 |a Includes bibliographical references (Attachment 1: page 70). 
650 0 |a Outdoor sounds  |z Alaska  |z Susitna River Region. 
650 0 |a Noise pollution  |z Alaska  |z Susitna River Region. 
710 2 |a Susitna-Watana Hydroelectric Project. 
650 0 |a Light pollution  |z Alaska  |z Susitna River Region. 
650 4 |a Aesthetic resources  |z Alaska  |z Susitna River Region. 
710 2 |a Alaska Energy Authority,  |e issuing body,  |e sponsoring body. 
710 2 |a AECOM (Firm),  |e author. 
730 0 |i Preceded by (expression):  |a Aesthetic resources study, Study plan Section 12.6, Initial Study Report. 
730 0 2 |a Aesthetic resources study, Study plan Section 12.6, Soundscape technical memorandum. 
740 0 2 |a Soundscape technical memorandum, Aesthetic resources study (12.6) 
596 |a 9 10 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 289. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa289/SuWa289sec12-6.pdf  |3 Link to this document.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa289/SuWa289.html  |3 List of related "Study Completion Reports" and "2014-2015 Study Implementation reports" published in October and November 2015 and May 2016.  |z ARLIS Document Server 
901 |a ARLIS  |c orig 201701