Riparian instream flow study, Study plan Section 8.6, 2014-2015 Study Implementation Report /
Construction of the Susitna-Watana Hydroelectric Project will alter the natural flow of the Susitna River. The purpose of this study is to provide a quantitative, spatially explicit model to predict potential effects to downstream floodplain vegetation from Project-modified operational flow, sedimen...
Saved in:
Alternate Title: | 2014-2015 Study Implementation Report. Riparian instream flow study (8.6) Riparian instream flow study, Study plan Section 8.6, Initial Study Report. |
---|---|
Corporate Contributor(s): | R2 Resource Consultants, ABR, Inc. Susitna-Watana Hydroelectric Project. Alaska Energy Authority, |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 289 |
Original Source: | Preceded by (expression): Riparian instream flow study, Study plan Section 8.6, Initial Study Report. |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 289. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03995cam a2200577Ia 4500 | ||
---|---|---|---|
001 | 2950401 | ||
003 | SIRSI | ||
005 | 20161215200707.0 | ||
007 | ta | ||
007 | cr cn||a|||||| | ||
008 | 161215s2015 akuabd bt s000 0 eng d | ||
040 | |a RLA |c RLA | ||
035 | |a (OCoLC)966294780 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 289 sec. 8.6 | |
088 | |a SuWa 289 | ||
098 | |a SuWa 00289 | ||
245 | 0 | 0 | |a Riparian instream flow study, Study plan Section 8.6, 2014-2015 Study Implementation Report / |c prepared by R2 Resource Consultants. |
246 | 1 | 7 | |a 2014-2015 Study Implementation Report. |p Riparian instream flow study (8.6) |
260 | |a [Anchorage] : |b [Alaska Energy Authority], |c [2015] | ||
300 | |a v, 64, iii, 25 p. : |b color illustrations, color maps, color charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 289 | |
500 | |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." | ||
500 | |a "Prepared for Alaska Energy Authority." | ||
500 | |a "November 2015." | ||
513 | |a November 2015; Study Completion and 2014/2015 Implementation Reports. | ||
500 | |a ARLIS assigned report number: SuWa 289. | ||
510 | 3 | |a Listed in December 2015 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: November 2015; Study Completion and 2014/2015 Implementation Reports. | |
580 | |a Preceded by: Riparian instream flow study, Study plan Section 8.6, Initial Study Report / prepared by R2 Resource Consultants. -- June 2014 (but Part D is dated November 2015). -- (Susitna-Watana Hydroelectric Project document ; no. 223). | ||
530 | |a Available also in electronic format on the Internet. | ||
520 | |a Construction of the Susitna-Watana Hydroelectric Project will alter the natural flow of the Susitna River. The purpose of this study is to provide a quantitative, spatially explicit model to predict potential effects to downstream floodplain vegetation from Project-modified operational flow, sediment, and ice process regimes. This document details Alaska Energy Authority's efforts in implementing the study during the 2014 and 2015 year periods and discusses the results in terms of study's seven stated objectes. It is intended to supplement Part A of the Initial Study Report. | ||
505 | 0 | |a Introduction -- Study objectives -- Study area -- Methods and variances -- Results -- Discussion -- Conclusion -- Tables - Figures -- Appendix A. Riparian vegetation groundwater/surface water study sampling design / prepared by R2 Resource Consultants, Inc., ABR, Inc. | |
504 | |a Includes bibliographical references (Main report: page 17; and Appendix A: page 5). | ||
650 | 0 | |a Riparian ecology |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Instream flow |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Dams |x Environmental aspects |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |x Research |z Alaska |z Susitna River. | |
710 | 2 | |a R2 Resource Consultants, |e author. | |
710 | 2 | |a ABR, Inc. |e author. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
710 | 2 | |a Alaska Energy Authority, |e issuing body, |e sponsoring body. | |
730 | 0 | |i Preceded by (expression): |a Riparian instream flow study, Study plan Section 8.6, Initial Study Report. | |
740 | 0 | 2 | |a Riparian vegetation groundwater/surface water study sampling design. |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 289. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa289/SuWa289sec8-6.pdf |3 Link to this document. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa289/SuWa289.html |3 List of related "Study Completion Reports" and "2014-2015 Study Implementation reports" published in October and November 2015 and May 2016. |z ARLIS Document Server |
901 | |a ARLIS |c orig 201612 | ||
596 | |a 9 10 |