Geology and soils characterization study, Study plan Section 4.5, 2014-2015 Study Implementation Report /

This report describes the Alaska Energy Authority's progress in the Geology and soils characterization study during 2014 and early 2015 being conducted for the proposed Susitna-Watana Hydroelectric Project. The purpose of the study is to define existing geological conditions at the dam site, re...

Full description

Saved in:
Bibliographic Details
Alternate Title:2014-2015 Study Implementation Report. Geology and soils characterization study (Study 4.5)

Preliminary reservoir slope stability assessment.

Susitna-Watana Hydroelectric Project geology and soils - interim mineral resource assessment report.

Regional geologic analysis.

Susitna-Watana Hydroelectric Project Seismic Network 2014 annual seismicity report.

Watana Dam exploration and testing program work plan 2014-2015.

Geology and soils characterization study, Study plan Section 4.5, Initial Study Report.

Susitna-Watana Hydroelectric Project crustal seismic source evaluation.

Susitna-Watana seismic monitoring project January-June 2015 report.
Additional Author(s):Van Pelt, Jennifer.

Campbell, Ryan (Engineering geologist).

Dugan, Robert G.

LaForge, Roland.

Richards, Paul.
Corporate Contributor(s):Alaska Earthquake Center,

Fugro Consultants (Firm),

MWH Americas, Inc.,

Golder Associates,

Alaska Energy Authority,

Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 289
Original Source:Preceded by (expression): Geology and soils characterization study, Study plan Section 4.5, Initial Study Report.

Susitna-Watana Hydroelectric Project crustal seismic source evaluation.

Susitna-Watana seismic monitoring project January-June 2015 report.
Series:Susitna-Watana Hydroelectric Project document ; no. 289.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Study objectives
  • Study area
  • Methods and variances in 2014
  • Results
  • Discussion
  • Conclusion
  • attachment 1. Interim mineral resource assessment report
  • attachment 2. Exploration and testing program work plan 2014-2015
  • attachment 3. Preliminary reservoir slope stability assessment
  • attachment 4. Geotechnical dam report
  • attachment 5. Dam site geology
  • attachment 6. Regional geologic analysis
  • attachment 7. Crustal seismic source evaluation
  • attachment 8. Seismic Network 2014 annual seismicity report
  • attachment 9. Seismic monitoring project January-June 2015 report.