Task 3, Hydrology. Slough hydrology interim report /

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority, Susitna Hydroelectric Project. Task 3, Hydrology. Slough hydrology interim report

Slough hydrology interim report

Susitna Hydroelectric Project. Slough hydrology interim report
Corporate Contributor(s):R & M Consultants,

Acres American Incorporated,

Alaska Power Authority,

Susitna Hydroelectric Project

HARZA-EBASCO Susitna Joint Venture.
Publisher:Alaska Power Authority,
Report Numbers:APA 38

APA 438
Series:Document (Susitna Hydroelectric Project) ; no. 38.
Document (Susitna Hydroelectric Project) ; no. 438.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02627cam a2200565Ia 4500
001 2941994
003 SIRSI
005 20161026121536.0
007 ta
007 cr bn||a||||||
008 161026s1982 akuab bt s000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)961215035 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b A23 no. 38 
088 |a APA 38 
088 |a APA 438 
245 0 0 |a Task 3, Hydrology.  |p Slough hydrology interim report /  |c prepared by R & M Consultants, Inc. 
246 3 |a Alaska Power Authority, Susitna Hydroelectric Project.  |n Task 3,  |p Hydrology.  |p Slough hydrology interim report 
246 3 0 |a Slough hydrology interim report 
246 1 4 |a Susitna Hydroelectric Project.  |p Slough hydrology interim report 
260 |a [Anchorage] :  |b Alaska Power Authority,  |c [1982] 
300 |a 100 pages in various pagings :  |b illustrations, maps ;  |c 28 cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Harza-Ebasco Susitna Joint Venture document ;  |v no. 38, 438 
500 |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. 
500 |a At head of cover title: Susitna Hydroelectric Project. 
500 |a "Prepared for Acres American Incorporated." 
500 |a "December 1982." 
500 |a Series statement from label on cover. Some copies are assigned different series numbering. 
500 |a Label on cover some of copies: "Susitna Hydroelectric Project, Supplemental Report, FERC Letter of 4/12/83. Page 31, Item 1. 20". 
510 3 |a Assigned APA Document no. 38 in the Susitna Hydroelectric Project document index. Also assigned number 438 (duplicate entry). 
530 |a Available also in electronic format on the Internet. 
504 |a Includes bibliographical references. 
650 0 |a Groundwater flow  |z Alaska  |z Susitna River Watershed. 
650 0 |a Streamflow  |z Alaska  |z Susitna River Watershed. 
650 0 |a Hydrology  |z Alaska  |z Susitna River Watershed. 
650 0 |a Wetlands  |z Alaska  |z Susitna River Watershed. 
710 2 |a R & M Consultants,  |e creator. 
710 2 |a Acres American Incorporated,  |e sponsoring body. 
710 2 |a Alaska Power Authority,  |e issuing body. 
710 2 |a Susitna Hydroelectric Project  |e sponsoring body. 
710 2 |a HARZA-EBASCO Susitna Joint Venture. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 38. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 438. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/0/APA38.pdf  |z ARLIS Document Server 
901 |a ARLIS  |c orig 201610 
596 |a 9 10