Task 3, Hydrology. Processed climatic data. Volume 8, 0700 - Eklutna Lake Station, June 1982 - September 1982 /
The Eklutna Station was installed on June 3, 1982 at the southern end of Eklutna Lake. It is the only project climate station located outside of the Susitna RIver Basin.There are no previous data reports for the Eklutna Lake Station.
Saved in:
LEADER | 03365cam a2200613Ia 4500 | ||
---|---|---|---|
001 | 2926826 | ||
003 | SIRSI | ||
005 | 20160721123134.0 | ||
007 | ta | ||
007 | cr bn||a|||||| | ||
008 | 160720s1982 akuab st s000 0 eng d | ||
040 | |a RLA |c RLA | ||
035 | |a (OCoLC)953802144 | ||
043 | |a n-us-ak | ||
045 | 2 | |b d198206 |b d198209 | |
050 | 4 | |a TK1425.S8 |b F472 no. 49 | |
088 | |a APA 49 | ||
245 | 0 | 0 | |a Task 3, Hydrology. |p Processed climatic data. |n Volume 8, |p 0700 - Eklutna Lake Station, June 1982 - September 1982 / |c prepared by R & M Consultants, Inc. |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Task 3, |p Hydrology. |p Processed climatic data. |n Volume 8, |p 0700 - Eklutna Lake Station, June 1982-September 1982 | |
246 | 3 | 0 | |a Processed climatic data. |n Volume 8, |p 0700 - Eklutna Lake Station, June 1982 - September 1982 |
246 | 1 | 4 | |a Processed climatic data, June 1982 thru September 1982. |n Volume 8, |p 0700 - Eklutna Lake Station |
246 | 3 | |a Susitna Hydroelectric Project. |p Processed climatic data, June 1982 thru September 1982. |n Volume 8, |p 0700 - Eklutna Lake Station | |
246 | 3 | |a Task 3, Hydrology. |p Processed climatic data. |p October 1981 - September 1982 | |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Task 3, |p Hydrology. |p Processed climatic data. |p October 1981 - September 1982 | |
260 | |a [Alaska] : |b Alaska Power Authority, |c [1982] | ||
300 | |a iii, 8, [37] pages : |b illustrations, map ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 49 | |
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a At head of cover title: Susitna Hydroelectric Project. | ||
500 | |a "Prepared for Acres American Incorporated." | ||
500 | |a Chiefly tables. | ||
500 | |a "December 1982." | ||
500 | |a Series statement from label on cover. | ||
510 | 3 | |a Assigned APA Document no. 49 in Susitna Hydroelectric Project document index. Also assigned no. 1739 (duplicate number). | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a The Eklutna Station was installed on June 3, 1982 at the southern end of Eklutna Lake. It is the only project climate station located outside of the Susitna RIver Basin.There are no previous data reports for the Eklutna Lake Station. | ||
651 | 0 | |a Eklutna Lake (Alaska) |x Climate |v Observations. | |
651 | 0 | |a Susitna River Valley (Alaska) |x Climate |v Observations. | |
650 | 7 | |a Climatology. |2 fast |0 (OCoLC)fst00864281 | |
655 | 7 | |a Observations. |2 fast |0 (OCoLC)fst01423822 | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a R & M Consultants, |e creator. | |
710 | 2 | |a Acres American Incorporated, |e sponsoring body. | |
710 | 2 | |a Alaska Power Authority, |e issuing body. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. |5 AkARLIS | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 49. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/0/APA49.pdf |3 Direct link to this volume. |z ARLIS Document Server |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/0/APA43.html |3 List of all volumes in the 1981-1982 climatic data set. |z ARLIS Document Server |
901 | |a ARLIS |c orig 201607 | ||
596 | |a 9 10 | ||
098 | |a APA 00049 |