Task 3, Hydrology. Processed climatic data. Volume 7, 0665 - Sherman Station, May 1982-September 1982 /
The Sherman Station began recording on May 15, 1982 after the Tyone River Station was relocated to become the Sherman Station. It is located at Susitna River Mile 129.5 downriver from Gold Creek.
Saved in:
LEADER | 03324cam a2200625Ia 4500 | ||
---|---|---|---|
001 | 2673054 | ||
003 | SIRSI | ||
005 | 20160721122855.0 | ||
007 | ta | ||
007 | cr bn||a|||||| | ||
008 | 160321s1982 akuab st s000 0 eng d | ||
040 | |a RLA |c RLA |d RLA | ||
035 | |a (OCoLC)945213150 | ||
043 | |a n-us-ak | ||
045 | 2 | |b d198205 |b d198209 | |
050 | 4 | |a TK1425.S8 |b F472 no. 48 | |
088 | |a APA 48 | ||
088 | |a APA 1739 | ||
245 | 0 | 0 | |a Task 3, Hydrology. |p Processed climatic data. |n Volume 7, |p 0665 - Sherman Station, May 1982-September 1982 / |c prepared by R & M Consultants, Inc. |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Task 3, |p Hydrology. |p Processed climatic data. |n Volume 7, |p 0665 - Sherman Station, May 1982-September 1982 | |
246 | 3 | 0 | |a Processed climatic data. |n Volume 7, |p 0665 - Sherman Station, May 1982-September 1982 |
246 | 1 | 4 | |a Processed climatic data, May 1982 thru September 1982. |n Volume 7, |p 0665 - Sherman Station |
246 | 3 | |a Susitna Hydroelectric Project. |p Processed climatic data, May 1982 thru September 1982. |n Volume 7, |p 0665 - Sherman Station | |
246 | 3 | |a Task 3, Hydrology. |p Processed climatic data. |p October 1981 - September 1982 | |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Task 3, |p Hydrology. |p Processed climatic data. |p October 1981 - September 1982 | |
260 | |a [Alaska] : |b Alaska Power Authority, |c [1982] | ||
300 | |a iii, 8, [45] pages : |b illustrations, map ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 1739 | |
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a At head of cover title: Susitna Hydroelectric Project. | ||
500 | |a "Prepared for Acres American Incorporated." | ||
500 | |a Chiefly tables. | ||
500 | |a "December 1982." | ||
500 | |a Series statement from label on cover. | ||
510 | 3 | |a Assigned APA Document no. 48 in Susitna Hydroelectric Project document index. Also assigned no. 1739 (duplicate number). | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a The Sherman Station began recording on May 15, 1982 after the Tyone River Station was relocated to become the Sherman Station. It is located at Susitna River Mile 129.5 downriver from Gold Creek. | ||
651 | 0 | |a Susitna River Valley (Alaska) |x Climate |v Observations. | |
650 | 7 | |a Climatology. |2 fast |0 (OCoLC)fst00864281 | |
655 | 7 | |a Observations. |2 fast |0 (OCoLC)fst01423822 | |
710 | 2 | |a Susitna Hydroelectric Project. | |
710 | 2 | |a R & M Consultants, |e creator. | |
710 | 2 | |a Acres American Incorporated, |e sponsoring body. | |
710 | 2 | |a Alaska Power Authority, |e issuing body. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. |5 AkARLIS | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 48. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1739. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/0/APA48.pdf |3 Direct link to this volume. |z ARLIS Document Server |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/0/APA43.html |3 List of all volumes in the 1981-1982 climatic data set. |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a APA 00048 | ||
098 | |a APA 01739 |