LEADER 01859cam a2200457Ia 4500
001 2642710
003 SIRSI
005 20151013193718.0
007 ta
007 cr cn||a||||||
008 151013s2015 akua r 000 0 eng d
040 |a RLA  |c RLA  |d RLA 
035 |a (OCoLC)923886847 
050 4 |a TK1425.S8  |b S92 no. 285 
088 |a SuWa 285 
100 1 |a Brehmer, Elwood,  |e author. 
245 1 0 |a Susitna-Watana studies resume after spending freeze lifted /  |c by Elwood Brehmer. 
300 |a [2] pages :  |b 1 col. ill. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a sheet  |b nb  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 285 
500 |a Caption title. 
500 |a This article appeared in the August 16, 2015 printed edition of "Alaska journal of commerce" on pages 11 and 20. 
500 |a ARLIS assigned report number: SuWa 285. 
530 |a Available also in electronic format on the Internet. 
533 |a Original copy and electronic reproduction.  |d 2015 
539 |a s  |b 2015 
610 2 0 |a Susitna-Watana Hydroelectric Project  |x Appropriations and expenditures. 
610 2 0 |a Susitna-Watana Hydroelectric Project  |x Research. 
650 0 |a Fiscal policy  |z Alaska. 
651 0 |a Susitna River (Alaska)  |x Power utilization. 
610 2 7 |a Susitna Hydroelectric Project.  |2 fast  |0 (OCoLC)fst00592845 
651 7 |a Alaska  |z Susitna River.  |2 fast  |0 (OCoLC)fst01246005 
655 4 |a Articles. 
773 0 8 |i Originally issued in:  |t Alaska journal of commerce (1998)  |g August 16, 2015  |x 1537-4947  |w (DLC) 2001215652  |w (OCoLC)42325896 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 285. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa285.pdf  |z ARLIS Document Server 
901 |a ARLIS  |c orig 201510 
596 |a 9 10 
098 |a SuWa 00281