BOC final report #4 with AEA responses.
This document contains questions from Alaska Energy Authority (AEA), excerpted from the report of the Independent Board of Consultants and Advisors' (BOC) fourth meeting. Included are the BOC's answers along with the AEA's responses to those answers.
Saved in:
Corporate Author: | |
---|---|
Corporate Contributor(s): | Alaska Energy Authority. Independent Board of Consultants and Advisors. Susitna-Watana Hydroelectric Project. Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors. Meeting (4th : 2014 April : Bellevue, Wash.) |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 278 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 278. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02870cam a2200517Ia 4500 | ||
---|---|---|---|
001 | 2616462 | ||
003 | SIRSI | ||
005 | 20150616024219.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 150616s2014 aku s000 0 eng d | ||
040 | |a RLA |c RLA |d RLA | ||
035 | |a (OCoLC)911078717 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 278 | |
088 | |a SuWa 278 | ||
049 | |a RLAA | ||
110 | 2 | |a Alaska Energy Authority. | |
245 | 1 | 0 | |a BOC final report #4 with AEA responses. |
260 | |a [Anchorage : |b Alaska Energy Authority, |c 2014] | ||
300 | |a 10 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 278 | |
500 | |a Caption title. | ||
500 | |a ARLIS assigned report number: SuWa 278. | ||
510 | 3 | |a Listed in April 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: Board of Consultant meeting. | |
513 | |a Board of Consultant meeting. | ||
500 | |a This document was filed as an attachment to: Board of Consultant Meeting #4, Susitna-Watana Hydroelectric Project P-14241-AK. (SuWa 276). | ||
650 | 0 | |a Hydroelectric power plants |z Alaska |z Susitna River |x Design and construction |v Congresses. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a This document contains questions from Alaska Energy Authority (AEA), excerpted from the report of the Independent Board of Consultants and Advisors' (BOC) fourth meeting. Included are the BOC's answers along with the AEA's responses to those answers. | ||
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project |v Congresses. |
650 | 0 | |a Dams |z Alaska |z Susitna River |x Design and construction |v Congresses. | |
650 | 0 | |a Earthquake hazard analysis |z Alaska |z Susitna River Region |v Congresses. | |
650 | 0 | |a Streamflow |z Alaska |z Susitna River |v Congresses. | |
710 | 2 | |a Alaska Energy Authority. |b Independent Board of Consultants and Advisors. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. |b Independent Board of Consultants and Advisors. |b Meeting |n (4th : |c 2014 April : |d Bellevue, Wash.) | |
787 | 0 | 8 | |i Originally submitted as an attachment to: |a Carey, Bryan. |t Board of Consultant Meeting #4, Susitna-Watana Hydroelectric Project P-14241-AK. |d [Anchorage] : Alaska Energy Authority, [2014] |w (OCoLC)911078638 |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 278. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa278.pdf |3 Direct link to this document. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa276.html |3 List of related documents: the meeting letter of April 29, 2014 and all attachments (SuWa 276-279). |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a SuWa 00278 |