Board of Consultant Meeting #4, Susitna-Watana Hydroelectric Project P-14241-AK.

This letter summarizes the discussion of the fourth Susitna-Watana Hydroelectric Project Independent Board of Consultants held April 2-4, 2014, and it serves as a cover letter to four attachments related to the meeting. The purpose of the meeting was to solicit advice on the Probable Maximum Precipi...

Full description

Saved in:
Bibliographic Details
Alternate Title:Title on Project's Document webpage: Board of Consultant Meeting #4 - Mr. Johnson
Main Author: Carey, Bryan,
Additional Author(s):Johnson, Douglas L. (Civil engineer),
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 276
Series:Susitna-Watana Hydroelectric Project document ; no. 276.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:This letter summarizes the discussion of the fourth Susitna-Watana Hydroelectric Project Independent Board of Consultants held April 2-4, 2014, and it serves as a cover letter to four attachments related to the meeting. The purpose of the meeting was to solicit advice on the Probable Maximum Precipitation (PMP) and Probable Maximum Flood (PMF) studies, the Site Specific Seismic Hazards Analysis studies, and the 2014 geotechnical investigation program. Progress on the RCC dam configuration feasibility and design was also discussed.
Physical Description:2 p. ; 28 cm.
Notes:Title from subject line.

"April 29, 2014."

ARLIS assigned report number: SuWa 276.

Letter to Douglas L. Johnson, Regional Engineer, Federal Energy Regulatory Commission, from Bryan Carey, Engineering Manager, Alaska Energy Authority, dated April 29, 2014.

Each attachment to this document is cataloged separately in order to provide details on those portions. These materials are assigned numbers SuWa 277 through 279.

This letter has three attachments, all pertaining to the fourth meeting of the Susitna-Watana Hydroelectric Project Independent Board of Consultants, held April 2-4, 2014 in Bellevue, Washington.
Report Type:Board of Consultant meeting.
Related Titles:Accompanied by (manifestation): Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors. AEA Susitna-Watana BOC Meeting - comment and response log. [Anchorage : Alaska Energy Authority, 2014]

Accompanied by (manifestation): Susitna-Watana Hydroelectric Project. Independent Board of Consultants and Advisors. Meeting (4th : 2014 April : Bellevue, Wash.). Susitna-Watana Dam Project (Project # P-14241-000), Independent Board of Consultants and Advisors Meeting No. 4 - April 2-4, 2014, Bellevue, WA. [Anchorage] : Alaska Energy Authority, [2014]

Accompanied by (manifestation): Alaska Energy Authority. BOC final report #4 with AEA responses. [Anchorage : Alaska Energy Authority, 2014]