Transmission line corridor screening. Closeout report. Task 8, Transmission /
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Transmission line corridor screening. Closeout report. Task 8, Transmission Alaska Power Authority, Susitna Hydroelectric Project. Task 8, Transmission. Subtask 8.01, Closeout report. Transmission line corridor screening Task 8, Transmission |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 342 APA 1348 SUS 68 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 342. Document (Susitna Hydroelectric Project) ; no. 1348. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02283cam a2200553Ia 4500 | ||
---|---|---|---|
001 | 252468 | ||
003 | SIRSI | ||
005 | 20130403085859.0 | ||
007 | cr bn||||a|||| | ||
008 | 860605s1982 akuab bt s000 0 eng d | ||
035 | |a (OCoLC)42983396 | ||
040 | |a AkU |c UAF |d RLA | ||
049 | |a RLAA | ||
088 | |a APA 342 | ||
088 | |a APA 1348 | ||
088 | |a SUS 68 | ||
090 | |a TK1425.S8 |b A23 no. 1348 | ||
090 | |a TK3226 |b .S975 1982 | ||
245 | 0 | 0 | |a Transmission line corridor screening. |p Closeout report. |n Task 8, |p Transmission / |c prepared by Acres. |
246 | 1 | 4 | |a Susitna Hydroelectric Project. |p Transmission line corridor screening. |p Closeout report. |n Task 8, |p Transmission |
246 | 1 | 6 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Task 8, |p Transmission. |n Subtask 8.01, |p Closeout report. |p Transmission line corridor screening |
246 | 3 | 0 | |a Task 8, |p Transmission |
260 | |a [Anchorage] : |b Alaska Power Authority, |c [1982] | ||
300 | |a 110 p. in various pagings (some folded) : |b ill., maps ; |c 28 cm. | ||
336 | |a text |2 rdacontent | ||
337 | |a computer |2 rdamedia | ||
338 | |a online resource |2 rdacarrier | ||
490 | 1 | |a [Document ; |v no. 342, 1348] | |
500 | |a At head of title: Susitna Hydroelectric Project. | ||
513 | |a Final report. | ||
500 | |a "March 1982." | ||
510 | 3 | |a Assigned document no. 342 in Susitna Hydroelectric Project document index. Also assigned no. 1348 (duplicate entry). | |
510 | 3 | |a Assigned SUS document no. 68 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in electronic format on the Internet. | ||
504 | |a Includes bibliographical references. | ||
650 | 0 | |a Electric lines |x Location |z Alaska. | |
650 | 0 | |a Electric power transmission |z Alaska. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 342. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1348. | |
043 | |a n-us-ak | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/13/APA1348.pdf |z ARLIS Document Server |
901 | |a 0104 |c TK1424.A4 S98 no.8 vol.1 pt.B | ||
596 | |a 9 10 11 | ||
098 | |a SUS 00068 | ||
098 | |a APA 00342 | ||
098 | |a APA 01348 |