%0 Book %I Alaska Power Authority %D 1982 %C Anchorage %G English %B Document (Susitna Hydroelectric Project) ; %B Document (Susitna Hydroelectric Project) ; %T Task 2, Surveys and site facilities. Subtask 2.10, Access roads, closeout reports, access route selection report %U https://www.arlis.org/docs/vol1/Susitna/15/APA1510.pdf %7 Array %X Presents the results of studies conducted to date by Acres to determine the optimum location of the access route.