1980-1981 geotechnical report /

This report presents a detailed description of the geological and geotechnical conditions at the Watana and Devils Canyon sites. These sites were studied in a geotechnical exploration program under Task 5.

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. 1980-81 geotechnical report

Alaska Power Authority, Susitna Hydroelectric Project, 1980-1981 geotechnical report
Corporate Contributor(s):Susitna Hydroelectric Project.

Acres American Incorporated.

Alaska Power Authority.

R & M Consultants.
Publisher:Alaska Power Authority,
Report Numbers:APA 69

APA 70

APA 71

APA 1266

APA 1267

APA 1268

SUS 37
Edition:Final draft.
Series:Document (Susitna Hydroelectric Project) ; no. 69-71.
Document (Susitna Hydroelectric Project) ; no. 1266-1268.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Contents:
  • v. 1. Text, final draft. (APA 69 or 1266)
  • v. 2, [pt. 1] Appendix A-F, final draft [APA 70 or 1267]
  • v. 2, [pt. 2] Appendix G-K, final draft. (APA 71 or 1268).
  • Detailed contents of v. 1: Introduction
  • Summary and conclusions
  • Review of previous investigations
  • Regional geology
  • Scope of geotechnical investigation
  • Results of geotechnical investigations, Watana
  • Results of geotechnical investigation, Devil Canyon [i.e. Devils Canyon].
  • Detailed contents of v. 2, [pt. 1]: appendix A.
  • Selected bibliography of previous investigations
  • appendix B.
  • Watana diamond core drilling logs
  • appendix C.
  • Devil Canyon diamond core drilling logs
  • appendix D.
  • Watana water pressure testing details
  • appendix E.
  • Devil Canyon water pressure testing details
  • appendix F.
  • Watana borrow area investigation ; F.1, Borrow site D ; F.2, Borrow site E ; F.3, Borrow site H ; F.4, Borrow sites I & J /
  • prepared by R & M Consultants, Inc. ; prepared for Acres.
  • Detailed contents of v. 2, [pt. 2]: appendix G.
  • Devil Canyon borrow area investigation ; G.1, Borrow site G /
  • prepared by R & M Consultants, Inc. ; prepared for Acres
  • appendix H.
  • Final report, Susitna Hydroelectric Project seismic refraction survey, summer 1980 /
  • submitted to R & M Consultants
  • appendix I.
  • Susitna Hydroelectric Project seismic refraction surveys, 1981 /
  • submitted to R & M Consultants
  • appendix J.
  • Air photo interpretation : Subtask 5.02, photo interpretation, terrain unit maps /
  • Acres [and] R & M Consultants, Inc.
  • appendix K.
  • Reservoir geology : reservior slope stability.