Final report on seismic studies for Susitna Hydroelectric Project /

Presents the results of the seismic studies, including geologic evaluation of faults and lineaments, a historical and microearthquake seismicity study, an assessment of the potential for reservoir-induced seismicity, and the estimation of ground-motion parameters for the Feasibility Study of the pro...

Full description

Saved in:
Bibliographic Details
Alternate Title:Alaska Power Authority Susitna Hydroelectric Project. Subtasks 4.09 through 4.15, Final report on seismic studies for Susitna Hydroelectric Project

Title on fiche header: Susitna Hydroelectric Project, final report on seismic studies for Susitna Hydroelectric Project, Subtasks 4.09 through 4.15

Subtasks 4.09 through 4.15, Final report on seismic studies for Susitna Hydroelectric Project
Corporate Contributor(s):Woodward-Clyde Consultants.

Acres American Incorporated.

Alaska Power Authority.
Publisher:Woodward-Clyde Consultants,
Report Numbers:APA 1255

APA 1256

APA 1434

SUS 40
Series:Document (Susitna Hydroelectric Project) ; no. 1255-1256.
Document (Susitna Hydroelectric Project) ; no. 1434.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 03832cam a2200661Ia 4500
001 250701
003 SIRSI
005 20120323094557.0
007 ta
007 he bmu---b|ca
007 cr cn||||a||||
008 820524s1982 xxuab b 000 0 eng d
035 |a (OCoLC)41681246 
040 |a AkU  |c UAF  |d OCLCQ  |d UAB  |d RLA 
049 |a RLAA 
088 |a APA 1255 
088 |a APA 1256 
088 |a APA 1434 
088 |a SUS 40 
090 |a TK1425.S8  |b A23 no. 1255-1256 
090 |a QE535.2.A4  |b S8474 0982 
245 0 0 |a Final report on seismic studies for Susitna Hydroelectric Project /  |c prepared by Woodward-Clyde Consultants for Acres American Incorporated. 
246 3 |a Alaska Power Authority Susitna Hydroelectric Project.  |n Subtasks 4.09 through 4.15,  |p Final report on seismic studies for Susitna Hydroelectric Project 
246 1 |i Title on fiche header:  |a Susitna Hydroelectric Project, final report on seismic studies for Susitna Hydroelectric Project, Subtasks 4.09 through 4.15 
246 3 |a Subtasks 4.09 through 4.15,  |p Final report on seismic studies for Susitna Hydroelectric Project 
260 |a [Place of publication not identified] :  |b Woodward-Clyde Consultants,  |c [1982] 
300 |a 365 leaves in various foliations (some folded) :  |b ill., maps (some col.) ;  |c 29 cm. 
490 1 |a [Document ;  |v no. 1255-1256, 1434] 
500 |a At head of title: Alaska Power Authority Susitna Hydroelectric Project, Subtasks 4.09 through 4.15. 
513 |a Final report. 
500 |a "February 1982." 
510 3 |a Assigned APA Document numbers 1255-1256 in the Susitna Hydroelectric Project document index. Based on paging in the entries, no. 1255 is assigned to chapters 1-10 and no. 1256 is assigned to the appendices in the same volume. Also assigned no. 1434 (duplicate entry). 
510 3 |a Assigned SUS document no. 40 in the Susitna Aquatic Impact Assessment Project bibliography. 
530 |a Also available on microfiche with variant title on header. 
530 |a Available also in electronic format on the Internet. 
520 |a Presents the results of the seismic studies, including geologic evaluation of faults and lineaments, a historical and microearthquake seismicity study, an assessment of the potential for reservoir-induced seismicity, and the estimation of ground-motion parameters for the Feasibility Study of the proposed Susitna Hydroelectric Project site. 
505 0 |a Summary -- Introduction -- Quaternary geology -- Significant features -- Seismicity and stress regime -- Reservoir-induced seismicity (RIS) -- Maximum credible earthquakes (MCEs) -- Ground motions -- Transmission line and access route susceptibility to seismically induced failure -- Conclusions -- appendix A. Methods of study -- appendix B. Glossary -- appdendix C. References. 
504 |a Includes bibliographical references (leaves C-1 - C-18). 
650 0 |a Seismology  |z Alaska  |z Susitna River Watershed. 
650 0 |a Seismology  |z Alaska  |v Observations. 
650 0 |a Dams  |x Earthquake effects  |z Alaska  |z Susitna River Watershed. 
650 0 |a Earthquake hazard analysis  |z Alaska  |z Susitna River Watershed. 
610 2 0 |a Susitna Hydroelectric Project. 
710 2 |a Woodward-Clyde Consultants. 
710 2 |a Acres American Incorporated. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1255-1256. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1434. 
043 |a n-us-ak 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/12/APA1255.pdf  |z Size: 37 MB.  |z ARLIS Document Server 
901 |a 0104  |c TK1424.A4S98 no. 4.09-4.15 
901 |a 0057  |c ALASKA QE535.2.A4S8474 
901 |a 3755 
596 |a 9 10 11 
098 |a SUS 00040 
098 |a APA 01255 
098 |a APA 01256 
098 |a APA 01434