Task 6, Design development. Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site /

"The scope of work under this subtask is essentially to review the designs previously undertaken not only for the Devil Canyon site but for comparable sites elsewhere in the world, and to consider the application of current state of the art design techniques for a dam at this site."--Leaf...

Full description

Saved in:
Bibliographic Details
Alternate Title:Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site

Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site

Closeout report. Evaluation of arch dam at Devil Canyon site

Evaluation of arch dam at Devil Canyon site

Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site
Corporate Contributor(s):Acres American Incorporated.

Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 337

APA 1280

SUS 73
Series:Document (Susitna Hydroelectric Project) ; no. 337.
Document (Susitna Hydroelectric Project) ; no. 1280.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Contents:
  • Introduction
  • Summary
  • Scope
  • Review of arch dam precedents
  • Geotechnical considerations
  • Seismic considerations
  • Evaluation of previous designs
  • Draft design
  • Stress analysis
  • Conclusions
  • Bibliography
  • appendix A. Stresses in thin arch dam
  • appendix B. Stresses in gravity arch dam.