Task 6, Design development. Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site /
"The scope of work under this subtask is essentially to review the designs previously undertaken not only for the Devil Canyon site but for comparable sites elsewhere in the world, and to consider the application of current state of the art design techniques for a dam at this site."--Leaf...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site Closeout report. Evaluation of arch dam at Devil Canyon site Evaluation of arch dam at Devil Canyon site Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 337 APA 1280 SUS 73 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 337. Document (Susitna Hydroelectric Project) ; no. 1280. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Introduction
- Summary
- Scope
- Review of arch dam precedents
- Geotechnical considerations
- Seismic considerations
- Evaluation of previous designs
- Draft design
- Stress analysis
- Conclusions
- Bibliography
- appendix A. Stresses in thin arch dam
- appendix B. Stresses in gravity arch dam.