Task 6, Design development. Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site /
"The scope of work under this subtask is essentially to review the designs previously undertaken not only for the Devil Canyon site but for comparable sites elsewhere in the world, and to consider the application of current state of the art design techniques for a dam at this site."--Leaf...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site Closeout report. Evaluation of arch dam at Devil Canyon site Evaluation of arch dam at Devil Canyon site Alaska Power Authority, Susitna Hydroelectric Project. Task 6, Design development. Subtask 6.04, Closeout report. Evaluation of arch dam at Devil Canyon site |
---|---|
Corporate Contributor(s): | Acres American Incorporated. Alaska Power Authority. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 337 APA 1280 SUS 73 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 337. Document (Susitna Hydroelectric Project) ; no. 1280. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04348cam a2200781Ia 4500 | ||
---|---|---|---|
001 | 250695 | ||
003 | SIRSI | ||
005 | 20140611044909.0 | ||
007 | ta | ||
007 | he bmu|||bbca | ||
007 | cr bn||||a|||| | ||
008 | 860605s1982 akuabef b s000 0 eng d | ||
040 | |a AkU |b eng |c UAF |d RLA |d UAB |d RLA |d OCLCQ |d RLA |d OCLCF |d RLA | ||
019 | |a 70525441 | ||
035 | |a (OCoLC)42992300 |z (OCoLC)70525441 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 337 | |
050 | 4 | |a TC557.A4 |b S9744 1982 | |
088 | |a APA 337 | ||
088 | |a APA 1280 | ||
088 | |a SUS 73 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Task 6, Design development. |n Subtask 6.04, |p Closeout report. |p Evaluation of arch dam at Devil Canyon site / |c prepared by Acres. |
246 | 3 | |a Susitna Hydroelectric Project. |n Task 6, |p Design development. |n Subtask 6.04, |p Closeout report. |p Evaluation of arch dam at Devil Canyon site | |
246 | 3 | 0 | |a Subtask 6.04, Closeout report. |p Evaluation of arch dam at Devil Canyon site |
246 | 3 | 0 | |a Closeout report. |p Evaluation of arch dam at Devil Canyon site |
246 | 3 | 0 | |a Evaluation of arch dam at Devil Canyon site |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Task 6, |p Design development. |n Subtask 6.04, |p Closeout report. |p Evaluation of arch dam at Devil Canyon site | |
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1982] | ||
300 | |a 58 p. in various pagings : |b ill., 3 maps, plans ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a [Document ; |v no. 337, 1280] | |
500 | |a "March 1982." | ||
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a At head of caption title on table of contents page: Alaska Power Authority, Susitna Hydroelectric Project. | ||
520 | |a "The scope of work under this subtask is essentially to review the designs previously undertaken not only for the Devil Canyon site but for comparable sites elsewhere in the world, and to consider the application of current state of the art design techniques for a dam at this site."--Leaf 1-1. | ||
510 | 3 | |a Assigned APA Document no. 337 in the Susitna Hydroelectric Project document index. Also assigned no. 1280 (duplicate entry). | |
510 | 3 | |a Assigned SUS document no. 73 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in microfiche format; illustrations and plates are rearranged. | ||
530 | |a Available also in electronic format on the Internet. | ||
505 | 0 | |a Introduction -- Summary -- Scope -- Review of arch dam precedents -- Geotechnical considerations -- Seismic considerations -- Evaluation of previous designs -- Draft design -- Stress analysis -- Conclusions -- Bibliography -- appendix A. Stresses in thin arch dam -- appendix B. Stresses in gravity arch dam. | |
504 | |a Includes bibliographical references (p. [10-3]-[10-4]). |b 19 | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
650 | 0 | |a Arch dams |z Alaska |z Susitna River |x Design and construction. | |
650 | 0 | |a Arch dams |z Alaska |z Devils Canyon |x Design and construction. | |
650 | 0 | |a Arch dams |x Earthquake effects |z Alaska |z Susitna River. | |
650 | 7 | |a Arch dams |x Earthquake effects. |2 fast |0 (OCoLC)fst00812862 | |
650 | 0 | |a Arch dams |x Earthquake effects |z Alaska |z Devils Canyon. | |
650 | 0 | |a Gravity dams |z Alaska |z Devils Canyon |x Design and construction. | |
650 | 0 | |a Hydroelectric power plants |z Alaska |z Devils Canyon |x Planning. | |
610 | 2 | 7 | |a Susitna Hydroelectric Project. |2 fast |0 (OCoLC)fst00592845 |
650 | 7 | |a Arch dams |x Design and construction. |2 fast |0 (OCoLC)fst00812861 | |
650 | 7 | |a Gravity dams |x Design and construction. |2 fast |0 (OCoLC)fst00946919 | |
650 | 7 | |a Hydroelectric power plants |x Planning. |2 fast |0 (OCoLC)fst00964961 | |
651 | 7 | |a Alaska |z Devils Canyon. |2 fast |0 (OCoLC)fst01870232 | |
651 | 7 | |a Alaska |z Susitna River. |2 fast |0 (OCoLC)fst01246005 | |
710 | 2 | |a Acres American Incorporated. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 337. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1280. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/3/APA337.pdf |z ARLIS Document Server |
901 | |a 3755 | ||
596 | |a 9 10 | ||
098 | |a SUS 00073 | ||
098 | |a APA 00337 | ||
098 | |a APA 01280 |