%0 Book %I Alaska Power Authority %D 1982 %C Anchorage, Alaska %G English %B Document (Susitna Hydroelectric Project) ; %B Document (Susitna Hydroelectric Project) ; %T Task 3, Hydrology. Hydraulic and ice studies %U https://www.arlis.org/docs/vol1/Susitna/4/APA442.pdf %X "The objective of this task was to study the Susitna River reach below the proposed dams to establish the natural streamflow regime and predict post-project changes."--Introd.