Subtask 3.01, Closeout report /
The objective of the Subtask 3.01 is to assemble and review all available reports, maps, and studies relating to the hydrologic aspects of the Susitna basin and neighboring basins and to abstract hydrologic design parameters required for the planning studies concerned with alternative hydroelectric...
Saved in:
Alternate Title: | Task 3, Hydrology. Subtask 3.01, Closeout report. Review of available material. [February 1981 version]. Alaska Power Authority, Susitna Hydroelectric Project. Subtask 3.01, Closeout report Title on cover and on table of contents page: Task 3, Hydrology. Subtask 3.01, Closeout report. Review of available material Alaska Power Authority, Susitna Hydroelectric Project. Task 3, Hydrology. Subtask 3.01, Closeout report. Review of available material Closeout report. Review of available material Review of available material |
---|---|
Corporate Contributor(s): | Alaska Power Authority. Acres American Incorporated. |
Publisher: | Acres American, |
Report Numbers: | APA 334 APA 1221 SUS 14 |
Edition: | [February 1981 version]. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 334. Document (Susitna Hydroelectric Project) ; no. 1221. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04348cam a2200697Ia 4500 | ||
---|---|---|---|
001 | 250468 | ||
003 | SIRSI | ||
005 | 20140611044909.0 | ||
007 | ta | ||
007 | he bm||||b|ca | ||
007 | cr cn||||a|||| | ||
008 | 980608s1981 nyuab bst 000 0 eng d | ||
040 | |a UAF |b eng |c UAF |d RLA |d OCLCQ |d OCLCF |d RLA | ||
035 | |a (OCoLC)39250542 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 1221 | |
050 | 4 | |a TC424.A4 |b S974 1981 | |
088 | |a APA 334 | ||
088 | |a APA 1221 | ||
088 | |a SUS 14 | ||
049 | |a RLAA | ||
130 | 0 | |a Task 3, Hydrology. |n Subtask 3.01, |p Closeout report. |p Review of available material. |s [February 1981 version]. | |
245 | 1 | 0 | |a Subtask 3.01, Closeout report / |c Acres American Incorporated. |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Subtask 3.01, |p Closeout report | |
246 | 1 | |i Title on cover and on table of contents page: |a Task 3, Hydrology. |n Subtask 3.01, |p Closeout report. |p Review of available material | |
246 | 3 | |a Alaska Power Authority, Susitna Hydroelectric Project. |n Task 3, |p Hydrology. |n Subtask 3.01, |p Closeout report. |p Review of available material | |
246 | 3 | 0 | |a Closeout report. |p Review of available material |
246 | 3 | 0 | |a Review of available material |
250 | |a [February 1981 version]. | ||
260 | |a Buffalo, N.Y. : |b Acres American, |c [1981] | ||
300 | |a 139 p. in various pagings : |b ill. (some folded), maps (some folded) ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a [Document ; |v no. 334, 1221] | |
500 | |a At head of title: Alaska Power Authority, Susitna Hydroelectric Project. | ||
500 | |a "February 1981." | ||
510 | 3 | |a Assigned APA Document no. 1221 in Susitna Hydroelectric Project document index. Also assigned number 334 (duplicate entry). | |
510 | 3 | |a Assigned SUS document no. 14 in the Susitna Aquatic Impact Assessment Project bibliography. | |
530 | |a Available also in microfiche format and electronic format on the Internet. | ||
520 | |a The objective of the Subtask 3.01 is to assemble and review all available reports, maps, and studies relating to the hydrologic aspects of the Susitna basin and neighboring basins and to abstract hydrologic design parameters required for the planning studies concerned with alternative hydroelectric sites including small hydroelectric development in the Alaska Railbelt. | ||
505 | 0 | |a Introduction -- Summary -- Scope of work -- Hydrologic data for the Susitna basin -- Hydrologic data for alternative hydro sites -- Climatic data -- appendix A. Streamflow gaging stations in the Susitna basin -- appendix B. Memo on probable maximum precipitation estimates from national weather service to corps of engineers - undated -- appendix C. Suspended gaging stations -- appendix D. Water quality - stations and parameters -- appendix E. Miscellaneous correspondence and minutes of meetings with various agencies -- appendix F. Monthly streamflow data for alternative hydro sites -- appendix G. Climate data stations -- appendix H. Snow survey - stations and period of records -- appendix I. Data collected by Alaska Department of Fish and Game. | |
504 | |a Includes bibliographical references. | ||
650 | 0 | |a Hydrology |z Alaska |z Susitna River Watershed. | |
650 | 0 | |a Hydrology |z Alaska. | |
651 | 0 | |a Susitna River Watershed (Alaska) | |
650 | 0 | |a Hydroelectric power plants |z Alaska. | |
650 | 0 | |a Water resources development |z Alaska. | |
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Acres American Incorporated. | |
787 | 0 | 8 | |i Replaced by (work): |t Task 3, Hydrology. Subtask 3.01, Closeout report. Review of available material. |b [Final]. |d [Anchorage, Alaska] : Alaska Power Authority, [1982] |r APA 27 |r APA 329 |r APA 1220 |w (OCoLC)881292376 |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 334. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 1221. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/12/APA1221.pdf |z ARLIS Document Server |
901 | |a 0057 |c ALASKA TC424..A4S974 1981 |c Book here-Ask REF | ||
901 | |a 3755 |h Shelved under 1221 (instead of 334) in order to place next to later version, APA 1220 | ||
596 | |a 9 10 11 | ||
098 | |a SUS 00014 | ||
098 | |a APA 00334 | ||
098 | |a APA 01221 |