Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000 ; Filing of additional information in response to October 2014 Initial Study Plan Meetings.
This cover letter accompanies two technical memoranda dealing with fish studies that were written during the 2014 study season of the Susitna-Watana Hydroelectric Project and submitted by the Alaska Energy Authority (AEA) to the Federal Energy Regulatory Commission as a group filing. In addition, pa...
Saved in:
Alternate Title: | Filing of additional information in response to October 2014 Initial Study Plan Meetings Title on Project's Document webpage: Cover letter - Filing of additional information in response to October 2014 Initial Study Plan Meetings |
---|---|
Main Author: | |
Additional Author(s): | Bose, Kimberly D., |
Corporate Contributor(s): | Alaska Energy Authority. Susitna-Watana Hydroelectric Project. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 269 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 269. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04286cam a2200577Ia 4500 | ||
---|---|---|---|
001 | 2431228 | ||
003 | SIRSI | ||
005 | 20150608023635.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 150608s2014 aku s000 0 eng d | ||
040 | |a RLA |c RLA |d RLA | ||
035 | |a (OCoLC)910854341 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 269 | |
088 | |a SuWa 269 | ||
049 | |a RLAA | ||
100 | 1 | |a Dyok, Wayne, |e author. | |
245 | 1 | 0 | |a Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000 ; Filing of additional information in response to October 2014 Initial Study Plan Meetings. |
246 | 3 | 0 | |a Filing of additional information in response to October 2014 Initial Study Plan Meetings |
246 | 1 | |i Title on Project's Document webpage: |a Cover letter - Filing of additional information in response to October 2014 Initial Study Plan Meetings | |
260 | |a [Anchorage] : |b Alaska Energy Authority, |c [2014] | ||
300 | |a 2 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 269 | |
500 | |a Title from subject line. | ||
500 | |a "December 17, 2014." | ||
500 | |a ARLIS assigned report number: SuWa 269. | ||
510 | 3 | |a Listed in December 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: December 17, 2014 technical memorandum filings. | |
500 | |a Each attachment to this document is cataloged separately in order to provide details on those portions. These materials are assigned numbers SuWa 270 and 271. | ||
513 | |a December 17, 2014 technical memorandum filings. | ||
513 | |a Technical memorandum. | ||
500 | |a Letter of transmittal to Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, from Wayne Dyok, Project Manager, Alaska Energy Authority, dated November 14, 2014. | ||
500 | |a This cover letter serves as a filing document for two technical memoranda generated during the 2014 study season of the Susitna-Watana Hydroelectric Project, each listed in the letter as attachments. The cover letter and the attached reports were submitted to FERC on December 17, 2014 (numbered SuWa 270 and 271). | ||
530 | |a Available also in electronic format on the Internet. | ||
650 | 0 | |a Hydrology |z Alaska |z Susitna River. | |
520 | |a This cover letter accompanies two technical memoranda dealing with fish studies that were written during the 2014 study season of the Susitna-Watana Hydroelectric Project and submitted by the Alaska Energy Authority (AEA) to the Federal Energy Regulatory Commission as a group filing. In addition, page 2 of this cover letter addresses data collected for AEA's quality assurance and quality control procedures available on its data website, but that website stopped working, and that specific data have not been published as a separate document. | ||
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project. |
651 | 0 | |a Susitna River (Alaska) |x Research. | |
700 | 1 | |a Bose, Kimberly D., |e addressee. | |
710 | 2 | |a Alaska Energy Authority. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
787 | 0 | 8 | |i Accompanied by (manifestation): |t Study of fish distribution and abundance in the upper Susitna River (Study 9.5), Evaluation of 2014 study modifications in the Black River technical memorandum. |d [Anchorage : Alaska Energy Authority, 2014] |k Susitna-Watana Hydroelectric Project document ; no. 270 |r SuWa 270 |n Attachment A to this letter. |w (OCoLC)910854367 |
787 | 0 | 8 | |i Accompanied by (manifestation): |t River productivity study (Study 9.8), Fish diet sample size sufficiency analysis technical memorandum. |d [Anchorage : Alaska Energy Authority, 2014] |k Susitna-Watana Hydroelectric Project document ; no. 271 |r SuWa 271 |n Attachment B to this letter. |w (OCoLC)910854219 |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 269. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa269.pdf |3 Direct link to this cover letter. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa254.html |3 List of all technical memorandums that were submitted as attachments to this cover letter (SuWa 269-271). |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a SuWa 00269 |