Study of fish passage barriers in the middle and upper Susitna River and Susitna tributaries (Study 9.12), fish passage criteria technical memorandum /
Initial Study Report (ISR) for the Susitna-Watana Hydroelectric Project was released in June 2014. The goal of Study 9.12 of the ISR is to describe how the Susitna-Watana Hydroelectric Project would affect flow and sediment transport and fish habitat in the Susitna River. This technical memorandum p...
Saved in:
Alternate Title: | Technical memorandum, fish passage barriers |
---|---|
Corporate Contributor(s): | Alaska Energy Authority. Susitna-Watana Hydroelectric Project. R2 Resource Consultants. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 267 |
Meetings: | Fisheries Technical Meeting (2014 March 19 : Anchorage, Alaska) |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 267. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03908nam a2200565Ia 4500 | ||
---|---|---|---|
001 | 2431222 | ||
003 | SIRSI | ||
005 | 20150608012216.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 150608s2014 akuabd bt s000 0 eng d | ||
040 | |a RLA |c RLA | ||
035 | |a (OCoLC)910851706 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 267 | |
088 | |a SuWa 267 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a Study of fish passage barriers in the middle and upper Susitna River and Susitna tributaries (Study 9.12), fish passage criteria technical memorandum / |c prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants, Inc. |
246 | 1 | 7 | |a Technical memorandum, fish passage barriers |
260 | |a [Anchorage : |b Alaska Energy Authority, |c 2014] | ||
300 | |a iii, 12, 5, 40 p. : |b col. ill., col. map, charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 267 | |
500 | |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." | ||
500 | |a "November 2014." | ||
500 | |a ARLIS assigned report number: SuWa 267. | ||
510 | 3 | |a Listed in November 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: November 14, 2014 technical memorandum filings. | |
513 | |a November 14, 2014 technical memorandum filings. | ||
513 | |a Technical memorandum. | ||
500 | |a This document was filed to FERC as Attachment M to: Filing of Initial Study Plan Meetings transcripts and additional information in response to October 2014 Initial Study Plan Meetings. (SuWa 254). | ||
500 | |a The "Technical Team Meeting" named on the table of contents page and on the section dividers is formally named "Fisheries Technical Meeting" in the meeting documents. | ||
530 | |a Available also in electronic format on the Internet. | ||
520 | |a Initial Study Report (ISR) for the Susitna-Watana Hydroelectric Project was released in June 2014. The goal of Study 9.12 of the ISR is to describe how the Susitna-Watana Hydroelectric Project would affect flow and sediment transport and fish habitat in the Susitna River. This technical memorandum presents a proposed final list of fish species that will be included in the fish barrier analysis as well as depth, leaping, and speed passage criterial for fish species. | ||
505 | 0 | |a [Main report] -- Appendix A. Notes from Technical Team Meeting March 19, 2014 -- Appendix B. Presentation from Technical Team Meeting March 19, 2014. | |
504 | |a Includes bibliographical references (p. 6-8). | ||
650 | 0 | |a Fishes |x Migration |x Research |z Alaska |z Susitna River. | |
650 | 0 | |a Fishes |x Habitat |x Research |z Alaska |z Susitna River. | |
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project |x Research. |
710 | 2 | |a Alaska Energy Authority. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
710 | 2 | |a R2 Resource Consultants. | |
711 | 2 | |a Fisheries Technical Meeting |d (2014 March 19 : |c Anchorage, Alaska) | |
787 | 0 | 8 | |i Originally submitted as Attachment M to: |a Dyok, Wayne. |t Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Filing of Initial Study Plan Meetings transcripts and additional information in response to October 2014 Initial Study Plan Meetings. |d [Anchorage : Alaska Energy Authority, 2014] |k Susitna-Watana Hydroelectric Project document ; no. 254 |r SuWa 254 |w (OCoLC)910851283 |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 267. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa267.pdf |3 Direct link to this document. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa254.html |3 List of all technical memorandums that were submitted as attachments to the cover letter filed to FERC on November 14, 2014 (SuWa 254-268). |z ARLIS Document Server |
596 | |a 9 10 | ||
098 | |a SuWa 00267 |