Study of fish passage barriers in the middle and upper Susitna River and Susitna tributaries (Study 9.12), fish passage criteria technical memorandum /

Initial Study Report (ISR) for the Susitna-Watana Hydroelectric Project was released in June 2014. The goal of Study 9.12 of the ISR is to describe how the Susitna-Watana Hydroelectric Project would affect flow and sediment transport and fish habitat in the Susitna River. This technical memorandum p...

Full description

Saved in:
Bibliographic Details
Alternate Title:Technical memorandum, fish passage barriers
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.

R2 Resource Consultants.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 267
Meetings:Fisheries Technical Meeting (2014 March 19 : Anchorage, Alaska)
Series:Susitna-Watana Hydroelectric Project document ; no. 267.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 03908nam a2200565Ia 4500
001 2431222
003 SIRSI
005 20150608012216.0
007 ta
007 cr cn||||a||||
008 150608s2014 akuabd bt s000 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)910851706 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 267 
088 |a SuWa 267 
049 |a RLAA 
245 0 0 |a Study of fish passage barriers in the middle and upper Susitna River and Susitna tributaries (Study 9.12), fish passage criteria technical memorandum /  |c prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants, Inc. 
246 1 7 |a Technical memorandum, fish passage barriers 
260 |a [Anchorage :  |b Alaska Energy Authority,  |c 2014] 
300 |a iii, 12, 5, 40 p. :  |b col. ill., col. map, charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 267 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a "November 2014." 
500 |a ARLIS assigned report number: SuWa 267. 
510 3 |a Listed in November 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: November 14, 2014 technical memorandum filings. 
513 |a November 14, 2014 technical memorandum filings. 
513 |a Technical memorandum. 
500 |a This document was filed to FERC as Attachment M to: Filing of Initial Study Plan Meetings transcripts and additional information in response to October 2014 Initial Study Plan Meetings. (SuWa 254). 
500 |a The "Technical Team Meeting" named on the table of contents page and on the section dividers is formally named "Fisheries Technical Meeting" in the meeting documents. 
530 |a Available also in electronic format on the Internet. 
520 |a Initial Study Report (ISR) for the Susitna-Watana Hydroelectric Project was released in June 2014. The goal of Study 9.12 of the ISR is to describe how the Susitna-Watana Hydroelectric Project would affect flow and sediment transport and fish habitat in the Susitna River. This technical memorandum presents a proposed final list of fish species that will be included in the fish barrier analysis as well as depth, leaping, and speed passage criterial for fish species. 
505 0 |a [Main report] -- Appendix A. Notes from Technical Team Meeting March 19, 2014 -- Appendix B. Presentation from Technical Team Meeting March 19, 2014. 
504 |a Includes bibliographical references (p. 6-8). 
650 0 |a Fishes  |x Migration  |x Research  |z Alaska  |z Susitna River. 
650 0 |a Fishes  |x Habitat  |x Research  |z Alaska  |z Susitna River. 
610 2 0 |a Susitna-Watana Hydroelectric Project  |x Research. 
710 2 |a Alaska Energy Authority. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a R2 Resource Consultants. 
711 2 |a Fisheries Technical Meeting  |d (2014 March 19 :  |c Anchorage, Alaska) 
787 0 8 |i Originally submitted as Attachment M to:  |a Dyok, Wayne.  |t Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Filing of Initial Study Plan Meetings transcripts and additional information in response to October 2014 Initial Study Plan Meetings.  |d [Anchorage : Alaska Energy Authority, 2014]  |k Susitna-Watana Hydroelectric Project document ; no. 254  |r SuWa 254  |w (OCoLC)910851283 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 267. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa267.pdf  |3 Direct link to this document.  |z ARLIS Document Server 
856 4 2 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa254.html  |3 List of all technical memorandums that were submitted as attachments to the cover letter filed to FERC on November 14, 2014 (SuWa 254-268).  |z ARLIS Document Server 
596 |a 9 10 
098 |a SuWa 00267