Initial Study Report Meetings, October 21, 2014 : Alaska Energy Authority - Board Room, 813 West Northern Lights Blvd., Anchorage, Alaska 99503.

The discussion at the October 21 meeting covered current efforts on the studies on wildlife (Studies 10.5 through 10.20) and plants and mapping (Studies 11.5, 11.7 through 11.9), proposed modifications to complete the studies, and comments from licensing participants.

Saved in:
Bibliographic Details
Alternate Title:Running title in Part A: Susitna-Watana Hydro ISR Meeting, October 21, 2014
Additional Author(s):Initial Study Report Meetings (2014 October 21 : Anchorage, Alaska)
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.

ABR, Inc.

Alaska. Department of Fish and Game.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 258
Meetings:Initial Study Report Meetings (2014 October 21 : Anchorage, Alaska)
Series:Susitna-Watana Hydroelectric Project document ; no. 258.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 04089nam a2200637Ia 4500
001 2431213
003 SIRSI
005 20150608012203.0
007 ta
007 cr cn||||a||||
008 150608s2014 akuabd s100 0 eng d
040 |a RLA  |c RLA 
035 |a (OCoLC)910851455 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 258 
088 |a SuWa 258 
049 |a RLAA 
111 2 |a Initial Study Report Meetings  |d (2014 October 21 :  |c Anchorage, Alaska) 
245 1 0 |a Initial Study Report Meetings, October 21, 2014 :  |b Alaska Energy Authority - Board Room, 813 West Northern Lights Blvd., Anchorage, Alaska 99503. 
246 1 |i Running title in Part A:  |a Susitna-Watana Hydro ISR Meeting, October 21, 2014 
260 |a [Anchorage :  |b Alaska Energy Authority,  |c 2014] 
300 |a 562 p. in various pagings :  |b col. ill., col. maps, col. charts ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 258 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a "Filed November 15, 2014." 
500 |a ARLIS assigned report number: SuWa 258. 
510 3 |a Listed in November 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: November 14, 2014 technical memorandum filings. 
513 |a November 14, 2014 technical memorandum filings. 
513 |a Technical memorandum. 
500 |a This document was filed to FERC as Attachment D to: Filing of Initial Study Plan meetings transcripts and additional information in response to October 2014 Initial Study Plan Meetings. (SuWa 254). 
500 |a Of the twenty presentations, fifteen had been prepared by ABR Inc., Environmental Research and Services and six by Alaska Department of Fish and Game (some jointly). 
530 |a Available also in electronic format on the Internet. 
520 |a The discussion at the October 21 meeting covered current efforts on the studies on wildlife (Studies 10.5 through 10.20) and plants and mapping (Studies 11.5, 11.7 through 11.9), proposed modifications to complete the studies, and comments from licensing participants. 
505 0 0 |t Part A. Transcripts --  |t Part B. Agenda and presentations. 
610 2 0 |a Susitna-Watana Hydroelectric Project  |x Research. 
610 2 0 |a Susitna-Watana Hydroelectric Project  |x Congresses. 
650 0 |a Animals  |x Research  |z Alaska  |z Susitna River Region. 
650 0 |a Ecological mapping  |x Research  |z Alaska  |z Susitna River Region. 
650 0 |a Habitat (Ecology)  |x Research  |z Alaska  |z Susitna River Region. 
650 0 |a Invasive plants  |x Research  |z Alaska  |z Susitna River Region. 
650 0 |a Plants  |x Research  |z Alaska  |z Susitna River Region. 
655 0 |a Business meetings. 
655 0 |a Business presentations. 
710 2 |a Alaska Energy Authority. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a ABR, Inc. 
710 1 |a Alaska.  |b Department of Fish and Game. 
787 0 8 |i Originally submitted as Attachment D to:  |a Dyok, Wayne.  |t Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Filing of Initial Study Plan Meetings transcripts and additional information in response to October 2014 Initial Study Plan Meetings.  |d [Anchorage : Alaska Energy Authority, 2014]  |k Susitna-Watana Hydroelectric Project document ; no. 254  |r SuWa 254  |w (OCoLC)910851283 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 258. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa258a.pdf  |x This URL for the first volume is needed for image to display in the OPAC.  |3 Direct link to Part A of this document.  |z ARLIS Document Server 
098 |a SuWa 00258 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa254.html  |3 List of all parts of this document (look under the section for SuWa 258).  |z This list includes all related technical memorandums that were submitted as attachments to the cover letter filed to FERC on November 14, 2014.  |z ARLIS Document Server 
596 |a 9 10