%0 Book %A Dyok, Wayne, %I Alaska Energy Authority %D 2014 %C Anchorage %G English %B Susitna-Watana Hydroelectric Project document ; %T Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000 ; Filing of Initial Study Plan Meetings transcripts and additional information in response to October 2014 Initial Study Plan Meetings. %U https://www.arlis.org/docs/vol1/Susitna2/2/SuWa254.pdf %U https://www.arlis.org/docs/vol1/Susitna2/2/SuWa254.html %X This cover letter accompanies fourteen attachments. Six attachments (Attachments A-F) are two-part reports on Initial Study Report (ISR) Meetings--the first part contains the meeting transcripts and the second part contains the agenda and presentations. Eight attachments (Attachments G-N) are technical memoranda that were written during the 2014 study season of the Susitna-Watana Hydroelectric Project and submitted by the Alaska Energy Authority to the Federal Energy Regulatory Commission as a group filing. Attachment N consists of errata pages that replace an earlier technical memorandum submitted on September 30, 2014 and that also replace 16 pages for a presentation found in the report for the October 16, 2014 ISR Meeting. This set of documents deal with research being conducted for hydropower development on the Susitna River. The technical memoranda cover fluvial geomorphology, fishery methodology, aquatic habitat mapping, fish passage criteria, and mercury monitoring.