River productivity study (Study 9.8), 2014 field season river productivity progress report, technical memorandum /
Operations of the proposed Susitna-Watana Hydroelectric Project would likely affect the abundance and distribution of benthic algae and benthic macroinvertebrate populations in the Susitna River, which could ultimately affect fish growth and productivity in the freshwater ecosystem. The goal of Stud...
Saved in:
Alternate Title: | Technical memorandum, 2014 field season river productivity progress report |
---|---|
Corporate Contributor(s): | Alaska Energy Authority. Susitna-Watana Hydroelectric Project. R2 Resource Consultants. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 246 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 246. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04180nam a2200601Ia 4500 | ||
---|---|---|---|
001 | 2389613 | ||
003 | SIRSI | ||
005 | 20150420031808.0 | ||
007 | ta | ||
007 | cr cn||||a|||| | ||
008 | 150420s2014 aku bt s000 0 eng d | ||
040 | |a RLA |c RLA | ||
035 | |a (OCoLC)907649033 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 246 | |
088 | |a SuWa 246 | ||
049 | |a RLAA | ||
245 | 0 | 0 | |a River productivity study (Study 9.8), 2014 field season river productivity progress report, technical memorandum / |c prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants, Inc. |
246 | 1 | 7 | |a Technical memorandum, 2014 field season river productivity progress report |
260 | |a [Anchorage : |b Alaska Energy Authority, |c 2014] | ||
300 | |a ii, 7 p. ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 246 | |
500 | |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." | ||
500 | |a "September 2014." | ||
500 | |a ARLIS assigned report number: SuWa 246. | ||
510 | 3 | |a Listed in September 2014 on the Susitna-Watana Hydroelectric Project's Document webpage under the category: September 26, 2014 technical memorandum filings. | |
513 | |a September 26, 2014 technical memorandum filings. | ||
513 | |a Technical memorandum. | ||
500 | |a This document was filed to FERC as Attachment G to: Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; second set of 2014 technical memoranda for Initial Study Plan meetings. (SuWa 239). | ||
530 | |a Available also in electronic format on the Internet. | ||
520 | |a Operations of the proposed Susitna-Watana Hydroelectric Project would likely affect the abundance and distribution of benthic algae and benthic macroinvertebrate populations in the Susitna River, which could ultimately affect fish growth and productivity in the freshwater ecosystem. The goal of Study 9.8 (to be submitted as part of the license application) is to collect baseline data to assist in evaluating the effects of Project-induced changes in flow and the interrelated environmental factors (temperature, substrate, water quality) upon the benthic macroinvertebrate and algal communities in the middle and lower Susitna River. Bioenergetic models show growth and consumption rates of juvenile chinook and coho salmon. This technical memorandum presents an update on activities conducted during spring field sampling in June 2014, which focused on needs of the trophic modeling and stable isotope analysis. | ||
504 | |a Includes bibliographical references (page 4). | ||
650 | 0 | |a Freshwater productivity |z Alaska |z Susitna River. | |
650 | 0 | |a Food chains (Ecology) |z Alaska |z Susitna River. | |
650 | 0 | |a Biotic communities |z Alaska |z Susitna River. | |
650 | 0 | |a Environmental sampling |z Alaska |z Susitna River. | |
650 | 0 | |a Stream invertebrates |z Alaska |z Susitna River. | |
650 | 0 | |a Benthic animals |z Alaska |z Susitna River. | |
650 | 0 | |a Freshwater animals |z Alaska |z Susitna River. | |
650 | 0 | |a Pacific salmon |x Productivity |z Alaska |z Susitna River. | |
650 | 0 | |a Fishes |x Productivity |z Alaska |z Susitna River. | |
710 | 2 | |a Alaska Energy Authority. | |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
710 | 2 | |a R2 Resource Consultants. | |
787 | 0 | 8 | |i Originally submitted as Attachment G to: |a Dyok, Wayne. |t Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; second set of 2014 technical memoranda for Initial Study Plan meetings. |d [Anchorage : Alaska Energy Authority, 2014] |k Susitna-Watana Hydroelectric Project document ; no. 239 |r SuWa 239 |w (OCoLC)907649014 |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 246. | |
596 | |a 9 10 | ||
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa246.pdf |3 Direct link to this document. |z ARLIS Document Server |
856 | 4 | 2 | |u https://www.arlis.org/docs/vol1/Susitna2/2/SuWa239.html |3 List of all technical memorandums that were submitted as attachments to the cover letter filed to FERC on September 26, 2014 (SuWa 239-246). |z ARLIS Document Server |
098 | |a SuWa 00246 |