Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000 ; Initial filing of September 2014 technical memoranda.

This cover letter accompanies ten documents that were written during the 2014 study season of the Susitna-Watana Hydroelectric Project and submitted by the Alaska Energy Authority to Federal Energy Regulatory Commission as a group filing. The nine technical memoranda all deal with the Susitna River...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial filing of September 2014 technical memoranda

Title on Project's Document webpage: Initial filing of September 17 technical memoranda cover letter
Main Author: Dyok, Wayne,
Additional Author(s):Bose, Kimberly D.,
Corporate Contributor(s):Alaska Energy Authority.

Susitna-Watana Hydroelectric Project.
Publisher:Alaska Energy Authority,
Report Numbers:SuWa 228
Series:Susitna-Watana Hydroelectric Project document ; no. 228.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:This cover letter accompanies ten documents that were written during the 2014 study season of the Susitna-Watana Hydroelectric Project and submitted by the Alaska Energy Authority to Federal Energy Regulatory Commission as a group filing. The nine technical memoranda all deal with the Susitna River (geomorphology, ice processes, or aquatic resources such as fish and habitat). The remaining document is a proposal on transportation planning for the project in the Susitna River valley.
Physical Description:4 p. ; 28 cm.
Notes:Title from subject line.

"September 17, 2014."

ARLIS assigned report number: SuWa 228.

Letter of transmittal to Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, from Wayne Dyok, Project Manager, Alaska Energy Authority, dated September 17, 2014.

Each attachment to this document is cataloged separately in order to provide details on those portions. These materials are also assigned numbers SuWa 229 through 238.

This cover letter serves as a filing document for ten documents (one proposal and nine technical memoranda) generated during the 2014 study season of the Susitna-Watana Hydroelectric Project, each listed in the letter as attachments. The cover letter and the attached reports were submitted to FERC on September 17, 2014 (numbered SuWa 228-238).
Report Type:September 17, 2014 technical memorandum filings.

Technical memorandum.
Related Titles:Accompanied by (manifestation): Alaska Energy Authority. Proposal to eliminate the Chulitna Corridor from further study. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 229 SuWa 229 Attachment A to this letter.

Accompanied by (manifestation): Ice processes in the Susitna River study (Study 7.6), detailed ice observations, October 2013 - May 2014, technical memorandum. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 230 SuWa 230 Attachment B to this letter

Accompanied by (manifestation): Study of fish distribution and abundance in the upper Susitna River (Study 9.5), proposed 2015 modifications to fish distribution and abundance study plan implementation, technical memorandum. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 231 SuWa 231 Attachment C to this letter

Accompanied by (manifestation): Characterization and mapping of aquatic habitats (Study 9.9), 2013 and 2014 aquatic habitat mapping field season completion progress, technical memorandum. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 233 SuWa 233 Attachment E to this letter

Accompanied by (manifestation): Eulachon run timing, distribution, and spawning in the Susitna River (Study 9.16), 2015 proposed eulachon spawning habitat study modifications, technical memorandum. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 234 SuWa 234 Attachment F to this letter

Accompanied by (manifestation): Fish and aquatics instream flow study (Study 8.5), evaluation of relationships between fish abundance and specific microhabitat variables, technical memorandum. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 235 SuWa 235 Attachment G to this letter

Accompanied by (manifestation): Fish and aquatics instream flow study (Study 8.5), 2013-2014 instream flow winter studies, technical memorandum. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 236 SuWa 236 Attachment H to this letter

Accompanied by (manifestation): Geomorphology study (Study 6.5), Susitna River historical cross section comparison (1980s to current), technical memorandum. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 237 SuWa 237 Attachment I to this letter

Accompanied by (manifestation): Geomorphology study (Study 6.5), 2014 update of sediment-transport relationships and a revised sediment balance for the middle and lower Susitna River segments, technical memorandum. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 238 SuWa 238 Attachment J to this letter

Accompanied by (manifestation): Study of fish distribution and abundance in the middle and lower Susitna River (Study 9.6), 2013-2014 winter fish study, technical memorandum. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 232 SuWa 232 Attachment D to this letter