Fish and aquatics instream flow study (Study 8.5), 2013-2014 instream flow winter studies, technical memorandum /
This is a study of existing aquatic habitats in the Susitna River watershed conduced as part of the planning of the Susitna-Watana Hydroelectric Project. The goal is to provide quantitative indices of existing aquatic habitats that enable a determination of the effects of alternative Project operati...
Saved in:
Alternate Title: | Technical memorandum, 2013-2014 instream flow winter studies |
---|---|
Corporate Contributor(s): | R2 Resource Consultants. Alaska Energy Authority. Susitna-Watana Hydroelectric Project. |
Publisher: | Alaska Energy Authority, |
Report Numbers: | SuWa 236 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 236. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Summary: | This is a study of existing aquatic habitats in the Susitna River watershed conduced as part of the planning of the Susitna-Watana Hydroelectric Project. The goal is to provide quantitative indices of existing aquatic habitats that enable a determination of the effects of alternative Project operational scenarios. This technical memorandum describes the methods applied and information collected as part of the 2013-2014 winter studies. Results of this study are presented in a different technical memorandum. |
---|---|
Physical Description: | v, 57 p. : col. maps, col. charts ; 28 cm. |
Notes: | "Susitna-Watana Hydroelectric Project (FERC No. 14241)." "September 2014." ARLIS assigned report number: SuWa 236. This document was filed to FERC as Attachment H to: Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Initial filing of September 2014 technical memoranda. (SuWa 228). Pages 38-40 (containing figures 2-4) were corrected by "Fish and aquatics instream flow study (Study 8.5), 2013-2014 instream flow winter studies, technical memorandum addendum" (SuWa 272) issued in December 2014. However, those replacement pages are numbered 2-4 to suit this addendum rather than the corresponding pages in this document. |
Report Type: | September 17, 2014 technical memorandum filings. Technical memorandum. |
Related Titles: | Originally submitted as Attachment H to: Dyok, Wayne. Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000; Initial filing of September 2014 technical memoranda. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 228 SuWa 228 Replaced in part by (work): R2 Resource Consultants. Fish and aquatics instream flow study (Study 8.5), 2013-2014 instream flow winter studies, technical memorandum addendum. [Anchorage : Alaska Energy Authority, 2014] Susitna-Watana Hydroelectric Project document ; no. 272 SuWa 272 Pages 38-40 only of SuWa 236 are replaced by document SuWa 272. |
Bibliography: | Includes bibliographical references (pages 23-28). |