Air quality study, Study plan Section 15.9, Initial Study Report /

An air quality analysis is being performed for approval by the Federal Energy Regulatory Commission for the Susitna-Watana Hydroelectric Project in Alaska. The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 15.9, Air quality study.

Initial Study Report. Air quality study (15.9)

Air quality study, Study plan Section 15.9, Study Completion Report.
Corporate Contributor(s):Alaska Energy Authority,

Susitna-Watana Hydroelectric Project.

Harris, Miller, Miller & Hanson Inc.,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (expression): Air quality study, Study plan Section 15.9, Study Completion Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 04095cam a2200637Ia 4500
001 2381721
003 SIRSI
005 20161215013711.0
007 ta
007 cr cn||||a||||
008 150331m20142015akubd bt s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d OCLCF  |d OCLCQ  |d RLA 
035 |a (OCoLC)905913624 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 223 sec. 15.9 
088 |a SuWa 223 
049 |a RLAA 
130 0 |a Initial Study Report.  |n Study plan Section 15.9,  |p Air quality study. 
245 1 0 |a Air quality study, Study plan Section 15.9, Initial Study Report /  |c prepared by HMMH. 
246 1 7 |a Initial Study Report.  |p Air quality study (15.9) 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2014-2015] 
300 |a 46 pages in various pagings :  |b color maps, color chart ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 223 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a "Prepared for Alaska Energy Authority." 
500 |a Parts A, B, and C are dated: June 2014. 
500 |a Part D is dated: November 2015. 
513 |a Initial Study Report. 
500 |a ARLIS assigned report number: SuWa 223. 
520 |a An air quality analysis is being performed for approval by the Federal Energy Regulatory Commission for the Susitna-Watana Hydroelectric Project in Alaska. The purpose of this study is to assess the current conditions of the study area against applicable state and national air quality standards and evaluate the Susitna-Watana Hydroelectric Project's air quality impact against these standards relative to both short-term (construction) and long-term (operational) impacts. The study area includes not only the immediate Project area, but also the greater Railbelt region. 
510 3 |a Listed on the Susitna-Watana Hydroelectric Project's Document webpage (starting in June 2014 with Parts A-C) under the category: Initial Study Report. 
580 |a Succeeded by: Air quality study, Study plan Section 15.9, Study Completion Report / prepared by HMMH. -- October 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289). 
530 |a Available also in electronic format on the Internet. 
505 0 |a Part A. Sections 1-6, 8-10 -- Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report) -- Part C. Executive summary and Section 7 -- Part D. Supplemental information to June 2014 Initial Study Report. 
504 |a Includes bibliographical references (Part A, page 13). 
650 0 |a Air quality  |z Alaska. 
650 0 |a Dams  |x Environmental aspects  |z Alaska. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |z Alaska. 
610 2 0 |a Susitna-Watana Hydroelectric Project. 
610 2 7 |a Susitna-Watana Hydroelectric Project.  |2 fast  |0 (OCoLC)fst01917261 
650 7 |a Air quality.  |2 fast  |0 (OCoLC)fst00802503 
710 2 |a Alaska Energy Authority,  |e issuing body,  |e sponsoring body. 
650 7 |a Dams  |x Environmental aspects.  |2 fast  |0 (OCoLC)fst00887340 
650 7 |a Hydroelectric power plants  |x Environmental aspects.  |2 fast  |0 (OCoLC)fst00964942 
651 7 |a Alaska.  |2 fast  |0 (OCoLC)fst01204480 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Harris, Miller, Miller & Hanson Inc.,  |e author. 
730 0 |i Succeeded by (expression):  |a Air quality study, Study plan Section 15.9, Study Completion Report. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 223. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223sec15-9ptA.pdf  |x This URL for the first part of this report is needed for image to display in the OPAC.  |3 Direct link to the first part of this report.  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223.html  |3 List of all parts of this document (see Section 15.9). List includes related Initial Study Reports.  |z ARLIS Document Server 
596 |a 10 
098 |a SuWa 00223