Regional economic evaluation study, Study plan Section 15.5, Initial Study Report /
This report describes a study to assess potential changes in regional economic conditions resulting from the operation of the proposed Susitna-Watana Hydroelectric Project and from the electric power generated by the Project. The study includes the effects of the Project resulting from improved reli...
Saved in:
Alternate Title: | Initial Study Report. Study plan Section 15.5, Regional economic evaluation study. Initial Study Report. Regional economic evaluation study (15.5) Technical memorandum on long-term modeling assumptions (LTMAs). |
---|---|
Additional Author(s): | Hartley, Marcus. |
Corporate Contributor(s): | Susitna-Watana Hydroelectric Project. Northern Economics (Firm) Veritas Economic Consulting. Alaska Energy Authority, |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 223 |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 223. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Part A. Sections 1-6, 8-10
- Appendix A. Draft: Technical memorandum on long-term modeling assumptions / Marcus Hartley, Patrick Burden, and Leah Cuyno. Anchorage, AK : Northern Economics. Dated December 13, 2013
- Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report)
- Part C. Executive summary and Section 7
- Part D. Supplemental information to June 2014 Initial Study Report.