Regional economic evaluation study, Study plan Section 15.5, Initial Study Report /

This report describes a study to assess potential changes in regional economic conditions resulting from the operation of the proposed Susitna-Watana Hydroelectric Project and from the electric power generated by the Project. The study includes the effects of the Project resulting from improved reli...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 15.5, Regional economic evaluation study.

Initial Study Report. Regional economic evaluation study (15.5)

Technical memorandum on long-term modeling assumptions (LTMAs).
Additional Author(s):Hartley, Marcus.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

Northern Economics (Firm)

Veritas Economic Consulting.

Alaska Energy Authority,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Contents:
  • Part A. Sections 1-6, 8-10
  • Appendix A. Draft: Technical memorandum on long-term modeling assumptions / Marcus Hartley, Patrick Burden, and Leah Cuyno. Anchorage, AK : Northern Economics. Dated December 13, 2013
  • Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report)
  • Part C. Executive summary and Section 7
  • Part D. Supplemental information to June 2014 Initial Study Report.