Aesthetic resources study, Study plan Section 12.6, Initial Study Report /

This study is being conducted as part of a series of studies to be submitted to the Federal Energy Regulatory Commission for licensing of the Susitna-Watana Hydroelectric Project in Alaska. The objectives for this study are to inventory and document baseline aesthetic (e.g. visual and auditory) cond...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 12.6, Aesthetic resources study.

Initial Study Report. Aesthetic resources study (12.6)

Aesthetic resources study, Study plan Section 12.6, 2014 Study Implementation Report.
Corporate Contributor(s):Alaska Energy Authority,

Susitna-Watana Hydroelectric Project.

URS Corporation,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (expression): Aesthetic resources study, Study plan Section 12.6, 2014 Study Implementation Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 04391cam a2200565Ia 4500
001 2381712
003 SIRSI
005 20170125152103.0
007 ta
007 cr cn||a||||||
008 150331m20142015akub bt s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d OCLCQ  |d RLA 
035 |a (OCoLC)905913127 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 223 sec. 12.6 
088 |a SuWa 223 
130 0 |a Initial Study Report.  |n Study plan Section 12.6,  |p Aesthetic resources study. 
245 1 0 |a Aesthetic resources study, Study plan Section 12.6, Initial Study Report /  |c prepared by URS Corporation. 
246 1 7 |a Initial Study Report.  |p Aesthetic resources study (12.6) 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2014-2015] 
300 |a 243 pages in various pagings :  |b color maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 223 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a "Prepared for Alaska Energy Authority." 
500 |a Parts A, B, and C are dated: June 2014. 
500 |a Part D is dated: November 2015. 
513 |a Initial Study Report. 
500 |a ARLIS assigned report number: SuWa 223. 
510 3 |a Listed on the Susitna-Watana Hydroelectric Project's Document webpage (starting in June 2014 with Parts A-C) under the category: Initial Study Report. 
580 |a Succeeded by: Aesthetic resources study, Study plan Section 12.6, 2014 Study Implementation Report / prepared by AECOM. -- October 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289). 
530 |a Available also in electronic format on the Internet. 
520 |a This study is being conducted as part of a series of studies to be submitted to the Federal Energy Regulatory Commission for licensing of the Susitna-Watana Hydroelectric Project in Alaska. The objectives for this study are to inventory and document baseline aesthetic (e.g. visual and auditory) conditions within the study area and evaluate the potential effects to aesthetic resources that may result from construction and operation of the proposed project. The analysis will focus on assessing these potential effects and will help identify potential design and other mitigation options. The primary study area is defined as a 30-mile buffer zone surrounding Project components (dam, reservoir, transmission lines, access corridors, dam, and camp facilities, and borrow sites). A secondary study area encompasses a region that mostly overlaps the primary area, but covers an area bounded by the George Parks Highway (western boundary), the Denali Highway (northern boundary), the Richardson Highway (eastern boundary), and the Glenn Highway (southern boundary). 
505 0 |a Part A. Sections 1-6, 8-10 -- Appendix A. Aesthetics analysis location map set -- Appendix B. Analysis locations narratives -- Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report) -- Part C. Executive summary and Section 7 -- Part D. Supplemental information to June 2014 Initial Study Report. 
504 |a Includes bibliographical references (Part A: pages 43-47). 
650 0 |a Landscape protection  |z Alaska  |z Susitna River Region. 
650 0 |a Light pollution  |z Alaska  |z Susitna River Region. 
650 0 |a Noise pollution  |z Alaska  |z Susitna River Region. 
650 4 |a Aesthetic resources  |z Alaska  |z Susitna River Region. 
710 2 |a Alaska Energy Authority,  |e issuing body,  |e sponsoring body. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a URS Corporation,  |e author. 
730 0 |i Succeeded by (expression):  |a Aesthetic resources study, Study plan Section 12.6, 2014 Study Implementation Report. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 223. 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223sec12-6ptA.pdf  |x This URL for the first part of this report is needed for image to display in the OPAC.  |3 Direct link to the first part of this document.  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223.html  |3 List of all parts of this document (see Section 12.6). List includes related Initial Study Reports.  |z ARLIS Document Server 
098 |a SuWa 00223 
596 |a 10