Aquatic furbearer abundance and habitat use, Study plan Section 10.11, Initial Study Report /

Baseline data will be collected on aquatic furbearers to enable assessment of potential effects of the proposed Susitna-Watana Hydroelectric Project. The study will include a mercury assessment. This information on beavers, river otters, mink, and muskrats will be used to develop appropriate mitigat...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 10.11, Aquatic furbearer abundance and habitat use.

Initial Study Report. Aquatic furbearer abundance and habitat use study (10.11)

Aquatic furbearer abundance and habitat use, Study plan Section 10.11, 2014-2015 Study Implementation Report.
Corporate Contributor(s):ABR, Inc.

Alaska Energy Authority,

Susitna-Watana Hydroelectric Project.
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (expression): Aquatic furbearer abundance and habitat use, Study plan Section 10.11, 2014-2015 Study Implementation Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:Baseline data will be collected on aquatic furbearers to enable assessment of potential effects of the proposed Susitna-Watana Hydroelectric Project. The study will include a mercury assessment. This information on beavers, river otters, mink, and muskrats will be used to develop appropriate mitigation measures. The study areas vary by species, but will encompass streams, riparian areas, and wetlands. Primarily, the study will focus on the Susitna River and river valley between Talkeetna and the confluence of the Oshetna River, a buffer zone around the inundation zone, and the access road and transmission-line corridors that reach Chulitna and the Denali Highway (continuing to Cantwell). This document details Alaska Energy Authority's status in implementing the study as set forth in the FERC-approved Revised study plan.
Physical Description:35 pages in various pagings : color maps ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

Parts A, B, and C are dated: June 2014.

Part D is dated: November 2015.

ARLIS assigned report number: SuWa 223.
Report Type:Initial Study Report.
Original Source:Succeeded by (expression): Aquatic furbearer abundance and habitat use, Study plan Section 10.11, 2014-2015 Study Implementation Report.
Bibliography:Includes bibliographical references (Part A, page 9).
Related Items:Succeeded by: Aquatic furbearer abundance and habitat use, Study plan Section 10.11, 2014-2015 Study Implementation Report / prepared by ABR, Inc. - Environmental Research & Services. -- October 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289).