Aquatic resources study within the access alignment, transmission alignment, and construction area, Study plan Section 9.13, Initial Study Report /

Construction and operation of the proposed Susitna-Watana Hydroelectric Project requires temporary and permanent infrastructure (access roads, transmission lines, airports, and construction sites). The objectives of this study are to characterize the aquatic habitats and fish assemblages at potentia...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 9.13, Aquatic resources study within the access alignment, transmission alignment, and construction area.

Initial Study Report. Aquatic resources study within the access alignment, transmission alignment, and construction area (9.13)
Corporate Contributor(s):R2 Resource Consultants.

Susitna-Watana Hydroelectric Project.

Alaska Energy Authority,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
LEADER 04115cam a2200541Ia 4500
001 2379785
003 SIRSI
005 20160728014747.0
007 ta
007 cr cn||||a||||
008 150320m20142015akuab bt s000 0 eng d
040 |a RLA  |b eng  |c RLA  |d OCLCQ  |d RLA 
035 |a (OCoLC)905370752 
043 |a n-us-ak 
050 4 |a TK1425.S8  |b S92 no. 223 sec. 9.13 
088 |a SuWa 223 
049 |a RLAA 
130 0 |a Initial Study Report.  |n Study plan Section 9.13,  |p Aquatic resources study within the access alignment, transmission alignment, and construction area. 
245 1 0 |a Aquatic resources study within the access alignment, transmission alignment, and construction area, Study plan Section 9.13, Initial Study Report /  |c prepared for Alaska Energy Authority ; prepared by R2 Resource Consultants, Inc. 
246 1 7 |a Initial Study Report.  |p Aquatic resources study within the access alignment, transmission alignment, and construction area (9.13) 
260 |a [Anchorage] :  |b [Alaska Energy Authority],  |c [2014-2015] 
300 |a 46 pages in various pagings :  |b color illustrations, color maps ;  |c 28 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a Susitna-Watana Hydroelectric Project document ;  |v no. 223 
500 |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." 
500 |a Parts A, B, and C are dated: June 2014. 
500 |a Part D is dated: November 2015. 
513 |a Initial Study Report. 
500 |a ARLIS assigned report number: SuWa 223. 
510 3 |a Listed on the Susitna-Watana Hydroelectric Project's Document webpage (starting in June 2014 with Parts A-C) under the category: Initial Study Report. 
530 |a Available also in electronic format on the Internet. 
650 0 |a Freshwater habitats  |x Research  |z Alaska  |z Susitna River Region. 
520 |a Construction and operation of the proposed Susitna-Watana Hydroelectric Project requires temporary and permanent infrastructure (access roads, transmission lines, airports, and construction sites). The objectives of this study are to characterize the aquatic habitats and fish assemblages at potential stream crossings along proposed access road and transmission line alignments and to describe aquatic habitats and species present within the construction area for the dam and related hydropower facilities. The study area includes lakes and streams within a 200-meter (650-foot) buffer zone of such infrastructure in the Susitna River and Tanana River basins. This document details Alaska Energy Authority's status in implementing the study as set forth in the FERC-approved Revised study plan and as modified by FERC's Study plan determination issued February 1, 2013. 
505 0 |a Part A. Sections 1-6, 8-10 -- Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report) -- Part C. Executive summary and Section 7 -- Part D. Supplemental information to June 2014 Initial Study Report. 
504 |a Includes bibliographical references (Part A, pages 6-7). 
650 0 |a Fishes  |x Effect of habitat modification on  |x Research  |z Alaska  |z Susitna River Region. 
650 0 |a Dams  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River Region. 
650 0 |a Hydroelectric power plants  |x Environmental aspects  |x Research  |z Alaska  |z Susitna River Region. 
710 2 |a R2 Resource Consultants. 
710 2 |a Susitna-Watana Hydroelectric Project. 
710 2 |a Alaska Energy Authority,  |e issuing body,  |e sponsoring body. 
830 0 |a Susitna-Watana Hydroelectric Project document ;  |v no. 223. 
596 |a 10 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223sec9-13ptA.pdf  |x This URL for the first part of this report is needed for image to display in the OPAC.  |3 Direct link to the first part of this document.  |z ARLIS Document Server 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223.html  |3 List of all parts of this document (see Section 9.13). List includes related Initial Study Reports.  |z ARLIS Document Server 
098 |a SuWa 00223