River productivity study, Study plan Section 9.8, Initial Study Report /
This study is being conducted as part of a series of studies to be submitted to the Federal Energy Regulatory Commission for licensing of the Susitna-Watana Hydroelectric Project in Alaska. Operations of the proposed project would likely affect the abundance and distribution of benthic algae and ben...
Saved in:
Alternate Title: | Initial Study Report. Study plan Section 9.8, River productivity study. Initial Study Report. River productivity study (9.8) River productivity study, Study plan Section 9.8, 2014 Study Implementation Report. |
---|---|
Corporate Contributor(s): | Alaska Energy Authority, Susitna-Watana Hydroelectric Project. R2 Resource Consultants, Alaska Cooperative Fish and Wildlife Research Unit, |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 223 |
Original Source: | Succeeded by (expression): River productivity study, Study plan Section 9.8, 2014 Study Implementation Report. |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 223. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
Contents:
- Part A. Sections 1-6, 8-10
- Appendix A. Review of the effects of hydropower on factors controlling benthic communities
- Appendix B. Site-specific sample collection locations
- Appendix C. Analysis of potentially dewatered river productivity sampling sites in 2013
- Appendix D. Talkeetna site selection consultation documentation
- Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report)
- Part C. Executive summary and Section 7
- Part D. Supplemental information to June 2014 Initial Study Report.