River productivity study, Study plan Section 9.8, Initial Study Report /

This study is being conducted as part of a series of studies to be submitted to the Federal Energy Regulatory Commission for licensing of the Susitna-Watana Hydroelectric Project in Alaska. Operations of the proposed project would likely affect the abundance and distribution of benthic algae and ben...

Full description

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 9.8, River productivity study.

Initial Study Report. River productivity study (9.8)

River productivity study, Study plan Section 9.8, 2014 Study Implementation Report.
Corporate Contributor(s):Alaska Energy Authority,

Susitna-Watana Hydroelectric Project.

R2 Resource Consultants,

Alaska Cooperative Fish and Wildlife Research Unit,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (expression): River productivity study, Study plan Section 9.8, 2014 Study Implementation Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Contents:
  • Part A. Sections 1-6, 8-10
  • Appendix A. Review of the effects of hydropower on factors controlling benthic communities
  • Appendix B. Site-specific sample collection locations
  • Appendix C. Analysis of potentially dewatered river productivity sampling sites in 2013
  • Appendix D. Talkeetna site selection consultation documentation
  • Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report)
  • Part C. Executive summary and Section 7
  • Part D. Supplemental information to June 2014 Initial Study Report.