Ice processes in the Susitna River study, Study plan Section 7.6, Initial Study Report /

The ice processes study is conducted to understand existing ice processes in the Susitna River and to predict ice processes after contruction of the Susitna-Watana Hydroelectric Project and the effects on the river's ecosystem.

Saved in:
Bibliographic Details
Alternate Title:Initial Study Report. Study plan Section 7.6, Ice processes in the Susitna River study.

Initial Study Report. Ice processes in the Susitna River study (7.6)

Ice processes in the Susitna River study, Study plan Section 7.6, 2014-2015 Study Implementation Report.
Corporate Contributor(s):Susitna-Watana Hydroelectric Project.

HDR, Inc.,

HDR Alaska, Inc.,

Alaska Energy Authority,
Publisher:[Alaska Energy Authority],
Report Numbers:SuWa 223
Original Source:Succeeded by (expression): Ice processes in the Susitna River study, Study plan Section 7.6, 2014-2015 Study Implementation Report.
Series:Susitna-Watana Hydroelectric Project document ; no. 223.
Subjects:
Online Access:Link to Full Text
Link to Full Text
Library Holdings:Print Versions
Description
Summary:The ice processes study is conducted to understand existing ice processes in the Susitna River and to predict ice processes after contruction of the Susitna-Watana Hydroelectric Project and the effects on the river's ecosystem.
Physical Description:191 pages in various pagings : color illustrations, color maps, color charts ; 28 cm.
Notes:"Susitna-Watana Hydroelectric Project (FERC No. 14241)."

"Prepared for Alaska Energy Authority."

Parts A, B, and C are dated: June 2014.

Part D is dated: November 2015.

ARLIS assigned report number: SuWa 223.

Parts B and C prepared by HDR.
Report Type:Initial Study Report.
Original Source:Succeeded by (expression): Ice processes in the Susitna River study, Study plan Section 7.6, 2014-2015 Study Implementation Report.
Bibliography:Includes bibliographical references (Part A, pages 26-28).
Related Items:Succeeded by: Ice processes in the Susitna River study, Study plan Section 7.6, 2014-2015 Study Implementation Report / prepared by HDR. -- October 2015 (but Appendix A is dated September 2015). -- (Susitna-Watana Hydroelectric Project document ; no. 289).