Geology and soils characterization study, Study plan Section 4.5, Initial Study Report /
This report describes the objects, methods, and activities being conducted in a geology and soils study is being conducted for the proposed Susitna-Watana Hydroelectric Project. The purpose of the study is to define existing geological conditions at the dam site, reservoir, and access and transmissi...
Saved in:
Alternate Title: | Initial Study Report. Study plan Section 4.5, Geology and soils characterization study. Initial Study Report. Geology and soils characterization study (4.5) Geology and soils characterization study, Study plan Section 4.5, 2014-2015 Study Implementation Report. |
---|---|
Corporate Contributor(s): | MWH Americas, Inc., Susitna-Watana Hydroelectric Project. Alaska Energy Authority, |
Publisher: | [Alaska Energy Authority], |
Report Numbers: | SuWa 223 |
Original Source: | Preceded by (expression): Geology and soils characterization study, Study plan Section 4.5, 2014-2015 Study Implementation Report. |
Series: | Susitna-Watana Hydroelectric Project document ;
no. 223. |
Subjects: | |
Online Access: | Link to Full Text Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 04531cam a2200589Ia 4500 | ||
---|---|---|---|
001 | 2378974 | ||
003 | SIRSI | ||
005 | 20170221140254.0 | ||
007 | ta | ||
007 | cr cn||a|||||| | ||
008 | 150310m20142015akuabd bt s000 0 eng d | ||
040 | |a RLA |b eng |c RLA |d RLA |d OCLCQ |d RLA | ||
035 | |a (OCoLC)904630242 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b S92 no. 223 sec. 4.5 | |
088 | |a SuWa 223 | ||
130 | 0 | |a Initial Study Report. |n Study plan Section 4.5, |p Geology and soils characterization study. | |
245 | 1 | 0 | |a Geology and soils characterization study, Study plan Section 4.5, Initial Study Report / |c prepared by MWH [i.e. MWH Americas, Inc.?]. |
246 | 1 | 7 | |a Initial Study Report. |p Geology and soils characterization study (4.5) |
260 | |a [Anchorage] : |b [Alaska Energy Authority], |c [2014-2015] | ||
300 | |a 44 pages in various pagings : |b color illustrations, color maps, color charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Susitna-Watana Hydroelectric Project document ; |v no. 223 | |
500 | |a "Susitna-Watana Hydroelectric Project (FERC No. 14241)." | ||
500 | |a "Prepared for Alaska Energy Authority." | ||
500 | |a Parts A, B, and C are dated: June 2014. | ||
500 | |a Part D is dated: November 2015. | ||
513 | |a Initial Study Report. | ||
500 | |a ARLIS assigned report number: SuWa 223. | ||
510 | 3 | |a Listed on the Susitna-Watana Hydroelectric Project's Document webpage (starting in June 2014 with Parts A-C) under the category: Initial Study Report. | |
580 | |a Succeeded by: Geology and soils characterization study, Study plan Section 4.5, 2014-2015 Study Implementation Report / prepared by MWH. -- October 2015. -- (Susitna-Watana Hydroelectric Project document ; no. 289). | ||
530 | |a Available also in electronic format on the Internet. | ||
520 | |a This report describes the objects, methods, and activities being conducted in a geology and soils study is being conducted for the proposed Susitna-Watana Hydroelectric Project. The purpose of the study is to define existing geological conditions at the dam site, reservoir, and access and transmission corridors; to develop design criteria to ensure that the proposed Susitna-Watana Hydroelectric Project facilities and structures will be safe and adequate to fulfill their functions; to evaluate the potential effects of Project construction and operation; to develop mitigation measures; and to acquire data to support design of the Project. The study area includes the dam site area, reservoir area, construction material sources, tailwater downstream of the dam, access road and transmission line corridors, airport facilities, and construction camp and permanent village sites. This document reports on Alaska Energy Authority's status in implementing the study and on how results are being achieved. | ||
505 | 0 | |a Part A. Sections 1-6, 8-9 -- Part B. Supplemental information (and errata) to Part A (February 3, 2014 Draft Initial Study Report) -- Part C. Executive summary and Section 7 -- Part D. Supplemental information to June 2014 Initial Study Report. | |
504 | |a Includes bibliographical references (Part A: page 12). | ||
650 | 0 | |a Geology |x Research |z Alaska |z Susitna River Region. | |
650 | 0 | |a Soils |x Research |z Alaska |z Susitna River Region. | |
650 | 0 | |a Minerals |x Research |z Alaska |z Susitna River Region. | |
650 | 0 | |a Hydroelectric power plants |x Environmental aspects |z Alaska |z Susitna River Region. | |
710 | 2 | |a MWH Americas, Inc., |e author. | |
650 | 0 | |a Dams |x Environmental aspects |z Alaska |z Susitna River Region. | |
610 | 2 | 0 | |a Susitna-Watana Hydroelectric Project |x Research. |
710 | 2 | |a Susitna-Watana Hydroelectric Project. | |
710 | 2 | |a Alaska Energy Authority, |e issuing body, |e sponsoring body. | |
730 | 0 | |i Preceded by (expression): |a Geology and soils characterization study, Study plan Section 4.5, 2014-2015 Study Implementation Report. | |
830 | 0 | |a Susitna-Watana Hydroelectric Project document ; |v no. 223. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223sec4-5ptA.pdf |x This URL for the first part of this report is needed for image to display in the OPAC. |3 Direct link to the first part of this report. |z ARLIS Document Server |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna2/ISR/SuWa223.html |3 List of all parts of this document (see Section 4.5). List includes related Initial Study Reports. |z ARLIS Document Server |
098 | |a SuWa 00223 | ||
596 | |a 9 10 |