Acres Task 6, Watana & Devil Canyon tunnel rating calculations.

Saved in:
Bibliographic Details
Alternate Title:Title on subject line on document transmittal sheet (inferred from first 13 letters only due to poor reproduction): Engineering calculations

Title in the Susitna Hydroelectric Project document index: Watana & Devil Canyon tunnel rating calculations
Main Author: Crawford, David (Hydraulic engineer),
Additional Author(s):Coleman, H. W.

R. J. S.,
Corporate Contributor(s):Acres American Incorporated.

HARZA-EBASCO Susitna Joint Venture.
Publisher:Acres American Incorporated,
Report Numbers:APA 80
Series:Document (Susitna Hydroelectric Project) ; no. 80.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
Description
Physical Description:[15] p. : ill. ; 28 cm.
Notes:Title from binder of one copy.

Series statement from label on cover.

First sheet (the document transmittal sheet) is an imperfect reproduction; some text is not readable due to parts of that page being blanked out.

This document comprises calculation sheets completed by DC [i.e. David Crawford, Head Hydraulic Engineer] and RJS at Acres American Incorporated. The sheets are dated September and October 1981. (Some sheets are undated and give no credit.) The sheets were compiled by David Crawford on March 9, 1983 for Wayne Coleman.