Susitna Hydroelectric Project, transmission line selected route final draft : figures /

The maps show the corridor selected for transmission lines to deliver electric power to the Railbelt area by the Susitna Hydroelectric Project in Alaska. The corridor between Anchorage and Fairbanks shown in this final draft is believed to meet the technical, economical, and environmental criteria t...

Full description

Saved in:
Bibliographic Details
Alternate Title:Transmission line selected route : final draft : figures
Corporate Author: Acres American Incorporated.
Corporate Contributor(s):Alaska Power Authority.
Publisher:Alaska Power Authority,
Report Numbers:APA 92

APA 1349

SUS 36
Series:Document (Susitna Hydroelectric Project) ; no. 92.
Document (Susitna Hydroelectric Project) ; no. 1349.
Subjects:
Online Access:Link to Full Text
Library Holdings:Print Versions
LEADER 02841cem a2200553Ia 4500
001 229323
003 SIRSI
005 20130913013546.0
008 861203s1982 aku a 0 eng d
019 |a 70525730 
034 1 |a a  |b 80000  |d N1503000  |e N1483000  |f N0650000  |g N0610000 
034 1 |a a  |b 88500  |d N1503000  |e N1483000  |f N0650000  |g N0610000 
035 |a (OCoLC)42993661  |z (OCoLC)70525730 
040 |a WaOLN  |c W7L  |d OCLCQ  |d RLA  |d OCLCQ  |d RLA 
049 |a RLAA 
088 |a APA 92 
088 |a APA 1349 
088 |a SUS 36 
090 |a TK1425.S8  |b A23 no. 1349 
110 2 |a Acres American Incorporated. 
245 1 0 |a Susitna Hydroelectric Project, transmission line selected route  |h [cartographic material] :  |b final draft : figures /  |c prepared by Acres. 
246 3 0 |a Transmission line selected route :  |b final draft : figures 
255 |a Scale [ca. 1:80,000] and [ca. 1:88,500]  |c (W 150°30ʹ--W 148°30ʹ/N 65°--N 61°). 
260 |a [Alaska, Alaska] :  |b Alaska Power Authority,  |c [1982] 
300 |a 1 atlas ([2], 14, [1], 48 leaves) :  |b 62 maps ;  |c 28 x 44 cm. 
336 |a cartographic image  |b cri  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
490 1 |a [Document ;  |v no. 92, 1349] 
500 |a Relief shown by contours. 
500 |a "March 1982." 
650 0 |a Electric power transmission  |z Alaska  |x Planning  |v Maps. 
510 3 |a Assigned APA Document no. 92 in the Susitna Hydroelectric Project document index. Also assigned no. 1349 (duplicate entry). 
510 3 |a Assigned SUS document number 36 in the Susitna Aquatic Impact Assessment Project bibliography. 
520 |a The maps show the corridor selected for transmission lines to deliver electric power to the Railbelt area by the Susitna Hydroelectric Project in Alaska. The corridor between Anchorage and Fairbanks shown in this final draft is believed to meet the technical, economical, and environmental criteria the best as discussed in the Transmission line corridor screening closeout report (published in 1981). For study methodology and selection criteria, see that report. 
650 0 |a Overhead electric lines  |x Right of way  |z Alaska  |v Maps. 
650 0 |a Electric lines  |z Alaska  |x Planning  |v Maps. 
610 2 0 |a Susitna Hydroelectric Project  |x Planning  |v Maps. 
710 2 |a Alaska Power Authority. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 92. 
830 0 |a Document (Susitna Hydroelectric Project) ;  |v no. 1349. 
043 |a n-us-ak 
596 |a 9 10 11 
856 4 1 |u https://www.arlis.org/docs/vol1/Susitna/13/APA1349.pdf  |z ARLIS Document Server 
901 |a 3755  |h Decision made that ARLIS use 1349 over 92 in order to group the transmission line materials 
901 |a 0104  |c TK1424.A4 S98 no.8 vol.4 
098 |a APA 00092 
098 |a SUS 00036 
098 |a APA 01349