Preliminary working draft, access plan report, Susitna Hydroelectric Project /
Various access routes to the Devil Canyon Dam and Watana Dam sites are evaluated. Harza-Ebasco concludes that the either the North or Denali access plans is acceptable and that the Denali plan in preferred. The North plan (Plan 16) consists of a gravel road from the George Parks Highway at Hurricane...
Saved in:
Alternate Title: | Alaska Power Authority, Susitna Hydroelectric Project. Access plan report Access plan report Title on label on cover provided by Harza-Ebasco research team: APA, Susitna Hydroelectric Project, access plan report |
---|---|
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. |
Publisher: | Harza-Ebasco Susitna Joint Venture, |
Report Numbers: | APA 500 |
Series: | Document (Susitna Hydroelectric Project) ;
no. 500. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 02920cam a2200517Ia 4500 | ||
---|---|---|---|
001 | 2055748 | ||
003 | SIRSI | ||
005 | 20140915130514.0 | ||
007 | ta | ||
007 | cr bn||a|||||| | ||
008 | 140915s1983 akuab bt 000 0 eng d | ||
040 | |a RLA |c RLA | ||
035 | |a (OCoLC)890600160 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 500 | |
088 | |a APA 500 | ||
245 | 0 | 0 | |a Preliminary working draft, access plan report, Susitna Hydroelectric Project / |c for Alaska Power Authority ; by Harza-Ebasco. |
246 | 1 | 4 | |a Alaska Power Authority, Susitna Hydroelectric Project. |p Access plan report |
246 | 3 | 0 | |a Access plan report |
246 | 1 | |i Title on label on cover provided by Harza-Ebasco research team: |a APA, Susitna Hydroelectric Project, access plan report | |
260 | |a [Alaska?] : |b Harza-Ebasco Susitna Joint Venture, |c 1983. | ||
300 | |a 183 p. in various pagings : |b ill., maps ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Harza-Ebasco Susitna Joint Venture document ; |v no. 500 | |
500 | |a "1983." | ||
500 | |a Series statement from label on cover. | ||
510 | 3 | |a Assigned APA Document no. 500 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a Various access routes to the Devil Canyon Dam and Watana Dam sites are evaluated. Harza-Ebasco concludes that the either the North or Denali access plans is acceptable and that the Denali plan in preferred. The North plan (Plan 16) consists of a gravel road from the George Parks Highway at Hurricane along the north bank of the Susitna River to Watana with provisions for a future branch road to the Devil Canyon site. The Denali plan (Plan 18) consists of a railhead at Cantwell with a new access road leading south towards Watana from a point on the Denali Highway 21 miles east of Cantwell; the Devil Canyon Dam would be supported by a rail spur from Gold Creek; and a road would be constructed between the two sites for operational purposes. | ||
504 | |a Includes bibliographical references. | ||
610 | 2 | 0 | |a Susitna Hydroelectric Project |x Planning. |
650 | 4 | |a Access roads |z Alaska |z Susitna River Region. | |
650 | 4 | |a Dams |x Access roads |z Alaska |z Susitna River Region. | |
650 | 0 | |a Transportation |z Alaska |z Susitna River Region |x Planning. | |
650 | 0 | |a Highway planning |z Alaska |z Susitna River Region. | |
650 | 0 | |a Roads |z Alaska |z Susitna River Region |x Design and construction. | |
650 | 0 | |a Route surveying |z Alaska |z Susitna River Region. | |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Alaska Power Authority. | |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 500. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/5/APA500.pdf |z ARLIS Document Server |
901 | |a ARLIS |c orig 201409 | ||
596 | |a 9 10 | ||
098 | |a APA 00500 |