River stage fluctuation resulting from alternative operations, Watana development /
River stage fluctuations due to alternative operations of the Watana Dam are estimated for the Susitna River from the Devil Canyon damsite to the Sunshine gage station located 14 miles downstream of the confluence of the Susitna and Chulitna rivers. Such operations would cause considerable fluctuati...
Saved in:
Alternate Title: | Susitna Hydroelectric Project. River stage fluctuation resulting from alternative operations, Watana development Watana development, river stage fluctuation resulting from alternative operations |
---|---|
Corporate Contributor(s): | HARZA-EBASCO Susitna Joint Venture. Alaska Power Authority. Susitna Hydroelectric Project. |
Publisher: | Alaska Power Authority, |
Report Numbers: | APA 884 |
Edition: | [January 1984 draft report]. |
Series: | Document (Susitna Hydroelectric Project) ;
no. 884. |
Subjects: | |
Online Access: | Link to Full Text |
Library Holdings: | Print Versions |
LEADER | 03562cam a2200577Ia 4500 | ||
---|---|---|---|
001 | 2052894 | ||
003 | SIRSI | ||
005 | 20140827153900.0 | ||
007 | ta | ||
007 | cr bn||a|||||| | ||
008 | 140827s1984 akuabd bt 000 0 eng d | ||
040 | |a RLA |c RLA |d RLA | ||
035 | |a (OCoLC)889348402 | ||
043 | |a n-us-ak | ||
050 | 4 | |a TK1425.S8 |b A23 no. 884 | |
088 | |a APA 884 | ||
245 | 0 | 0 | |a River stage fluctuation resulting from alternative operations, Watana development / |c report by Harza-Ebasco Susitna Joint Venture ; prepared for Alaska Power Authority. |
246 | 3 | |a Susitna Hydroelectric Project. |p River stage fluctuation resulting from alternative operations, Watana development | |
246 | 1 | 4 | |a Watana development, river stage fluctuation resulting from alternative operations |
250 | |a [January 1984 draft report]. | ||
260 | |a [Anchorage, Alaska] : |b Alaska Power Authority, |c [1984] | ||
300 | |a iii, 6, [29] p. : |b 5 maps, 18 charts ; |c 28 cm. | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a unmediated |b n |2 rdamedia | ||
338 | |a volume |b nc |2 rdacarrier | ||
490 | 1 | |a Document ; |v no. 884 | |
500 | |a At head of title: Susitna Hydroelectric Project. | ||
500 | |a "January 1984." | ||
500 | |a "Susitna file no. 42.2.3." | ||
500 | |a "Draft report"--Cover. | ||
513 | |a Draft report. | ||
500 | |a "Final report" appears on title page, but the final version was published in May 1984. | ||
500 | |a Two versions of this draft report were issued in January 1984 and are cataloged separately. The text pages were formatted differently. This version has a formal cover with series statement routinely used for Susitna Hydroelectric Project reports. The other version (marked as a response to agency comment on the cover) lacks that cover. | ||
500 | |a "Federal Energy Regulatory Commission, Project No. 7114"--Cover. | ||
510 | 3 | |a Assigned APA Document no. 884 in the Susitna Hydroelectric Project document index. | |
530 | |a Available also in electronic format on the Internet. | ||
520 | |a River stage fluctuations due to alternative operations of the Watana Dam are estimated for the Susitna River from the Devil Canyon damsite to the Sunshine gage station located 14 miles downstream of the confluence of the Susitna and Chulitna rivers. Such operations would cause considerable fluctuation of reservoir releases within short time intervals. Both dams make up the proposed Susitna Hydroelectric Project. An later report by the same title was issued in May 1984 (Document no. 1652) in order to provide a study of stage fluctuations for more moderate discharge variations than those covered in this report. | ||
504 | |a Includes bibliographical references (p. 6). | ||
650 | 0 | |a Streamflow |z Alaska |z Susitna River |x Forecasting. | |
650 | 0 | |a Water levels |z Alaska |z Susitna River |x Forecasting. | |
651 | 0 | |a Susitna River (Alaska) | |
610 | 2 | 0 | |a Susitna Hydroelectric Project. |
710 | 2 | |a HARZA-EBASCO Susitna Joint Venture. | |
710 | 2 | |a Alaska Power Authority. | |
710 | 2 | |a Susitna Hydroelectric Project. | |
787 | 0 | 8 | |i Continued by (work): |t River stage fluctuation resulting from alternative operations, Watana development. |b [May 1984 final report]. |d [Anchorage, Alaska] : Alaska Power Authority, [1984] |k Document (Susitna Hydroelectric Project) ; no. 1652 |r APA 1652 |w (OCoLC)880682528 |
830 | 0 | |a Document (Susitna Hydroelectric Project) ; |v no. 884. | |
856 | 4 | 1 | |u https://www.arlis.org/docs/vol1/Susitna/8/APA884.pdf |z ARLIS Document Server |
098 | |a APA 00884 | ||
901 | |a 3755 |c orig | ||
596 | |a 9 10 |